Challenge

Identification of Cracks

1.

a)

Observation

  • Concrete crushed and the reinforced is exposed.
  • Concrete spalled beyond the reinforcement which may be a sign of rupture.
  • Beam top portion looks safe because of the flange advantage from slab.
  • The crack develops from bottom to top means rebar yielding occurs in support bottom only.

Result & Conclusion

  • Its form of Flexural failure due to reversal of stress during earthquake.
  • During stress reversal, support top experiences compression and bottom experiences tension.
  • Top compression is managed by slab advantage. Bottom tension was not satisfied by the provided reinforcement.
  • Since the reinforcement got yielded, it can not be prepaired.

b)

Observation

  • Cracks along Beam-Column edge.
  • Cracks seem to have developed through the structure as it looks much wider.
  • Beam looks seperated from the column at joints.
  • Concrete is not severely crushed.

Result & Conclusion

  • Its beam pull out failure due to insufficient development length of reinforcement in joints.
  • During earthquake, The horizontal movement of structure makes this condition worse and detached the beam member from column.
  • Providing anchorage length between two existing concrete is very difficult. So not repairable.

c)

Observation

  • Cracks are exactly at the joint of Column- Beam.
  • Cracks in Beam developed through its entire width.
  • Slab also developed more cracks along the beam width direction.

Result & Conclusion

  • It's a plastic hinge failure.
  • The damage occured only in the joint zone first of all.
  • Cyclic lateral loading & stress reversal at the joints led to the damage.
  • Even the slab participated to its best to handle the tension (Slab is severely cracked means it has undergone tension with its flange condition), But unable to control the damage.
  • The joint can be strengthened.

2.

a)

Observation

  • Concrete damaged at the top of a column.
  • Concrete all around the column face.
  • Beams are safe.
  • The location of column looks at edge of the building.
  • No walls are built along the column means it is probably at ground floor, for parking car movement access.

Result & Conclusion

  • It is a soft storey failure, technically plastic hinge formation.
  • Due to absence of infill walls at the ground floor, The plastic hinge forms at the top of ground storey columns during lateral movement.
  • Based on the development of crush of concrete, it can either be repairable or non-repairable.

b)

Observation

  • Concrete developed complete breakage diagonally.
  • Longitudinal reinforcements are intact.
  • Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)

Result & Conclusion

  • It is a pure shear failure.
  • Inadequate shear reinforcement compels concrete takes all the shear stresses.

c)

Observation

  • Column failed completely.
  • Failure at top of column.
  • There are two slabs connected to the column. Probably one at mid height of column.
  • The wooden piles might be a post failure support after column failed, providing temperory prop to avoid collapse of the entire structures.

Result & Conclusion

  • It is a column failure.
  • An additional slab or a beam connected to a column in mid-height leads to the effect.
  • This leads to failure especially if the connection is unintentional and not accounted in design.
  • Not repairable.


Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.