Observation
- Concrete crushed and the reinforced is exposed.
- Concrete spalled beyond the reinforcement which may be a sign of rupture.
- Beam top portion looks safe because of the flange advantage from slab.
- The crack develops from bottom to top means rebar yielding occurs in support bottom only.
Result & Conclusion
- Its form of Flexural failure due to reversal of stress during earthquake.
- During stress reversal, support top experiences compression and bottom experiences tension.
- Top compression is managed by slab advantage. Bottom tension was not satisfied by the provided reinforcement.
- Since the reinforcement got yielded, it can not be prepaired.
b)
Observation
- Cracks along Beam-Column edge.
- Cracks seem to have developed through the structure as it looks much wider.
- Beam looks seperated from the column at joints.
- Concrete is not severely crushed.
Result & Conclusion
- Its beam pull out failure due to insufficient development length of reinforcement in joints.
- During earthquake, The horizontal movement of structure makes this condition worse and detached the beam member from column.
- Providing anchorage length between two existing concrete is very difficult. So not repairable.
c)
Observation
- Cracks are exactly at the joint of Column- Beam.
- Cracks in Beam developed through its entire width.
- Slab also developed more cracks along the beam width direction.
Result & Conclusion
- It's a plastic hinge failure.
- The damage occured only in the joint zone first of all.
- Cyclic lateral loading & stress reversal at the joints led to the damage.
- Even the slab participated to its best to handle the tension (Slab is severely cracked means it has undergone tension with its flange condition), But unable to control the damage.
- The joint can be strengthened.
2.
a)
Observation
- Concrete damaged at the top of a column.
- Concrete all around the column face.
- Beams are safe.
- The location of column looks at edge of the building.
- No walls are built along the column means it is probably at ground floor, for parking car movement access.
Result & Conclusion
- It is a soft storey failure, technically plastic hinge formation.
- Due to absence of infill walls at the ground floor, The plastic hinge forms at the top of ground storey columns during lateral movement.
- Based on the development of crush of concrete, it can either be repairable or non-repairable.
b)
Observation
- Concrete developed complete breakage diagonally.
- Longitudinal reinforcements are intact.
- Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)
Result & Conclusion
- It is a pure shear failure.
- Inadequate shear reinforcement compels concrete takes all the shear stresses.
c)
Observation
- Column failed completely.
- Failure at top of column.
- There are two slabs connected to the column. Probably one at mid height of column.
- The wooden piles might be a post failure support after column failed, providing temperory prop to avoid collapse of the entire structures.
Result & Conclusion
- It is a column failure.
- An additional slab or a beam connected to a column in mid-height leads to the effect.
- This leads to failure especially if the connection is unintentional and not accounted in design.
- Not repairable.