Challenge

Identification of Cracks

Question 1:

a)

Observation:

  • Concrete crushed and the reinforcement is exposed.
  • Concrete spalled beyond the reinforcement which may be a sign of rupture.
  • Beam top potion looks safe because of the flange advantage from the slab.
  • The crack develops from the bottom to bottom Means rebars yielding occurs in support bottom only.

Answer:

  • Its form of structural failure due to reversal of stress during earthquake.
  • During stress rehearsal supports top experience compression and bottom experience tension.
  • Top comparison in managed by slab advantage bottom tension was not satisfied by the provider reinforcement.
  • Censor reinforcement got yielded, it can not be repaired.

b)

Observation:

  • Cracks along beam column edges.
  • Cracks seem to have developed through the structural as it looks much wider.
  • Beam looks separated from the column at joints.
  • Concrete is not severely crushed.

Answer:

  • It’s been pull out failure due to the insufficient development length or reinforcement end joins.
  • During earthquake, the horizontal movement of structure makes the condition worse and detached the beam member from column.
  • Providing encourage a length between two existing concrete is very difficult. So not repairable.

c)

Observation:

  • Cracks are exactly at the joints of the column beam.
  • Cracks is being developed through its entire width.
  • Slab also developed more cracks along the beam with directions.

Answer:

  • It’s a plastic hinge failure.
  • The damage occurs only in the joint zone First of all.
  • Cycle lateral loading and stress reversal at the joints led to the damage.
  • Even the slab participated to its best to handle the tension (labels several leak crack means it has undergone tension with the flange condition) but unable to control the damage.
  • The joints can be strengthened.

What is the mode of failure or damage of the beams in the figure above? Are the damages repairable? Elaborate

Question 2:

a)

Observation:

  • Concrete damaged at top of column.
  • Concrete damaged all around the column face.
  • Beams are safe.
  • The location of column looks at edge of the building.
  • No walls are built along the column means it is probably at ground floor, for parking cars moment access.

Answer:

  • It’s a soft storey failure, technical plastic hinge formation.
  • Due to absence of infill walls at the ground floor the plastic hinge forms at the top of ground story columns during the lateral moments.
  • Based on the development of crush of concrete it can either be repairable or non-repairable.

b)

Observation:

  • Concrete tabs complicate breakage technology diagonally.
  • Longitudinal reinforcements are intact.
  • Shear reinforcement spacing looks wider which means probably lesser rebar provides.

Answer:

  • It’s a your sheer failure.
  • Inadequate shear reinforcement campus concrete takes all the sheer stresses.

c)

Observation:

  • Column failed completely.
  • Failure at top of column.
  • There are two slabs connected to the column probably one at the mid height of the column.
  • The wooden piles might be a post failure support after column failed, providing temporary prop to avoid collapse of the entire structure.

Answer:

  • It’s a short column failure.
  • And additional slab or a beam connected to the column in mid height leads to the effect.
  • This leads to failure especially if the connection is unintentionally and not accounted in design.
  • The failure given in the picture is not at all repairable.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.