Challenge

Identification of Cracks

Question 1:

a) Observation :

  • Concrete is detroirated from the bottom of the beam.
  • Top portion of the beam is found good due to flange from the slab.
  • The rebar yielding is from bottom.

Answer:

  • The failure occurs due to the reverse stress during the earthquake.
  • The compression acts at the top and tension at bottom of the beam.
  • The compression is supported by the slab and the tension couldn't be managed by the reinforcement which is not sufficient.
  • Hence the reinforcement is yielded and cannot be repaired.

b) Observation:

  • The cracks are developed along the column.
  • The crack is also developed exactly at the joints of the beam and column.
  • However the concrete is not crushed.

Answer:

  • The failure is due to the insufficient anchorage distance between the beam and column.
  • The horizontal movement of the structure during earthquake make it worse.
  • Hence it cannot be repairable between the existing concrete.

c) Observation:

  • The cracks are developed at the joint and along the beam.
  • The crack also occured in the slab along the beam direction.

Answer:

  • The cracks is is in the corner position only which is the Plastic hinge failure.
  • The lateral loading and reversal stress causes the damage.
  • The slab also participated in bearing the tension since the cracks are developed in slab, which is also not sufficient to manage the tension.
  • This can repairable.

2.

a) Observation:

  • The cracks are developed along the column.
  • The beam is safe.
  • There is no partition wall connected to the column.

Answer:

  • This is a Plastic hinge failure.
  • This is due to there is no walls at ground floor, plastic hinge occurs at top level due to lateral movement of the structure.
  • This can be repairable or non-repairable based on concrete crush.

b) Observation:

  • Concrete damages completely.
  • The reinforcement also detroirated.
  • The rebar size provided is probably not sufficient.

Answer:

  • This is a total shear failure.
  • This cannot be repairable.

c) Observation:

  • The column is totally failed and damaged.
  • Two slabs are connected to the column.
  • The slab is supported with the wood pipes to support the column.

Answer:

  • This is due to the structure is not accounted in the design.
  • This failure is due to the short column.
  • This cannot be repairable.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.