1 a

Observations

Concrete crushed and the reinforcement is exposed

Concrete spalled beyond the reinforcement which may be a sign of rupture

Beam top portion looks safe because of thr flange advantage from the slab

The crack develops from the bottom to top means rebar yielding occurs in the support bottom only

Its form of flextural failure due to reversal of stress during the earthquake

During the stress reversal support top experiences compression and bottom experiences tension

Top compression is managed by the slab advantage.bottom tension was not satisfied by the provided reinforcement

Since the reinforcement got yielded it cannaot be repaired

1 b

Observations

Cracks along the Beam-Coloumn edge

Cracks seem to have developed through the structure as it looks much wider

Beam looks separated from the coloumn at joints

Concrete is not severely crushed

Its beam pull out failure due to insufficient development length of the reinforcement in joints

During the earthquake the horizontal movement of the structure makes this condition worse and detached the beam member from coloumn

Providing anchorage length between two existing concrete is very difficult so not repairable

1 c

Observations

Cracks are exactly at the joints of the Coloumn-Beam

Cracks in Beam developed througth its entire width

Slab also developed more cracks along the beam width direction

Its a plastic hinge failure

The damage occured only in the joint zone first of all

Cyclic lateral loading & stress reversal at the joints led to thr damage

Even the slab participated to its best to handle the tension slab is severly cracked means it as undergone tension with its flange condition but unable to control the damage

The joint can be strengthened

2 a

Observations

Concrete is damaged at the top of the coloumn

Concrete damaged all around the coloumn face

Beams are safe

The location of the coloumn looks at the edge of the building

No walls are build along the coloumn means it is probably at the ground floor for parking car movement access

Its a soft storey failure technically plastic hinge formation

Due to absence of infill walls at the ground floor the plastic hinge forms at the top of the ground storey coloumns during lateral movement

Based on the development of crush of concrete it can either be repairable or Non repairable

2 b

Observations

Concrete developed complete breakage diagonally

Longitudinal reinforcement are intact

Shear renforcement spacing looks wider (which means probably lesser the shear rebar provided )

Its a pure shear failure

Inadequate shear renforcement compels concrete takes all the shear stresses

2 c

Observations

Coloumn failed completely

Failure at the top of coloumn

There are two slabs connected to the coloumn,probably one at the mid height of the coloumn

The wooden piles might be a post failure support after the coloumn failed, providing temporary prop to avoid collapse of the entire structure

Its a Short Coloumn failure

An additional slab/beam connected to a coloumn in mid-height lead to this effect

This leads to the failure especially if the connection is unintentional and not accounted in design

The failure given in the picture is not at all repairable

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.