Channel Flow using CONVERGE STUDIO

Objective: The simulation was run by refining the grid size successively in three steps as follows: Grid Size 1. 2e-4 m 2. 1.5e-4 m 3. 1.2e-4 m The post-processing results of the three cases are as follows: 1. 2e-4 m Velocity Magnitude Mass Flow Rate Species Mass Cell Count 2. 1.5e-4m Velocity Magnitude Mass Flow…