Roles of Engineering Disciplines in Industrial Projects

A free lesson from Skill-Lync's Basic Structural Engineering Concepts of Industrial Structures course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Engineering Disciplines and Their Roles in Industrial Projects”

What will you learn in this free Basic Structural Engineering Concepts of Industrial Structures lesson?

The instructor explains how the project, process, piping, mechanical, electrical and instrumentation departments work together and what each hands to the others, with piping stress analysis named as the source of loading data for civil design. The lesson also states that design is about 10% of project value but drives almost 90% of its impact.

  • Project department role in scheduling and tracking
  • Process deliverables: PFDs, P and IDs, line lists
  • Piping layout and stress analysis outputs
  • Mechanical, electrical and instrumentation responsibilities

What comes after lesson 3?

Later in Skill-Lync's Basic Structural Engineering Concepts of Industrial Structures course (paid): lesson 4, Civil Department in Engineering Projects; lesson 5, Structural Engineering in Industrial Projects Recap; lesson 6, Loads on Industrial Structures. The full course has 12 lessons (4 h 4 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Now we will see the various engineering disciplines and their roles and responsibilities for an industrial project. For any large or small projects, we need many partners or disciplines to come together and do their role and responsibilities. So this engineering project or any industrial project, it's always a collaborative effort of all different type of departments. Without any one of those, the project would not be complete. Inside any organization which carries out any project, there are various disciplines. Some of the disciplines may be in-house, some of the disciplines may be outside the company or the organization.

However, all these disciplines will always be there, whether internally or externally. On the screen, you can see various disciplines, starting with the project department, process department, piping department, mechanical, electrical, instrumentation department, civil department, procurement department, and last but not the least, the construction department. All these different roles play a significant role because they have their individual responsibilities of their own specialization and also they have to see whether the project goal or scope is in line with the requirements from the client. So in favor of the project or in interest of the project, the main aim of all the discipline is to focus on the project, design it and see that everything is safe within the project.

If anything is going outside the scope of work or as it is designed or desired to be operated, then it's responsibility of each of these disciplines to manage and correct it as and when required. Also, not only correcting it is important, there is sometimes requirement of value addition, like in case piping department has been doing some work and they are stuck somewhere, then the other disciplines, if they can help them to find out a solution, say example, a civil department can come forward and help them to optimize or give some solution.

So like that, each and every discipline has to collaborate with each other to complete the project. Another important role of this engineering disciplines is to give information to each other. Like in case for any engineering project, one of the output for each of the disciplines may be giving inputs to other disciplines, like starting with a project, the process department would come into picture, then process department, PNIDs and PFDs would be used by piping department to carry out their engineering. Some of the outputs from piping may be used by civil and or mechanical department to carry out their deliverables and so on and so forth.

So here, the project department is to coordinate between all these departments and also to see overall that every discipline is carrying out its role in a timely manner or a planned manner within the given timelines and in a desired quality. So here, the main coordinator is project department, but ownership of the project lies with each and every stakeholder, here the stakeholder of the project is each and every department. Now, in any engineering project, the design phase is the most important because value wise design phase may be contributing only to around 10% of the total value of the project, but its impact is significant.

Like anything you decide or design during the design phase, that has an impact of almost 90% to the project. So the impact of all these disciplines individually and also collaboratively plays a vital role in the success of the project. Now, we will see one by one, each discipline, how they work, what are their roles and responsibilities. First and foremost, the project department and its role and responsibilities. So the very basic goal of project department is to lead other disciplines. Project department is the leader of all other disciplines and it supports other disciplines to carry out the day-to-day activities.

Also, once a project is well defined, project definition is the responsibility of the project department and the scope of work which is given by the client or which is defined in the earlier stages of the projects like feed and basic engineering or the proposal stage stages. Those are carried forward by the project department and those are more elaborated so that the complete scope of work is well defined and there is no ambiguity in the scope of work. Another important task of the project department is the schedule of work.

Any project or any industrial or engineering project is always time bound. They have specified time considerations or a target on which it is to be complete in a staggered manner is well defined and to ensure that it is being planned or it is practically possible to get it done in that scheduled timelines is the responsibility of the project department. Another important task which the project department does is the day-to-day tracking of the project and this is done through progress monitoring. There are variety of tools available in the market to monitor the progress.

However, this progress monitoring is a very dynamic activity. Suppose there is any lag in the project or if there is delay in some of the disciplines or overall project so which may be a delay in delivering the final project. So project is department is responsible for carrying out the tracking of the project and this is done by monitoring the deliverables and actually studying the plan versus delivery dates. And also come up with any recovery plan in case of any delays. Also, another important task which the project department does is to evaluate the project success.

Ultimately, at the end of the project, the final product should be delivered to the client with sufficient quality and within the given timelines. And also, it should be within the given cost even if the cost escalates or even if there is delay in the project that should be attributed to some practical reasons. Say, if there is escalation in the cost, the cost escalation should be in line with the market trends. Say, if the inflation is very high during the actual construction of the project, then the cost is bound to go up.

So such parameters are tracked by the project department, they are studied, evaluated and always seen that the ultimate output is a successful project. So all these parameters are responsibility of the project departments. Always there are other disciplines which are supporting the project. It is not the complete role of project department. It is a group activity or a team work. But project department is always a leader and a guide to other disciplines. With that, we will see the next discipline. Another important department which we are going to see now is the process department.

Now, any chemical plant or an industrial facility has some or the other chemical process going through it. So it's very inherent that the chemical engineering department is into picture. It analyze the stream in detail, process in detail. Once the client comes up with a idea or a requirement with a budget in mind, the very first discipline from the technical side to come into picture is the process department. And to review the feasibility of the process, this department carries out a very important role. Process engineers, they study the process.

They go in depth to understand what are the available technical options to carry out certain processes. And also they determine the balance or steam balance on the equipment side as well. A process engineer has to study the heat, mass balance for the equipment and pipe using process simulations. So the technical feasibility which is under study during the complete phase of the project or during the initial phases of the project, that is responsibility of a process engineer. And as I said earlier, the deliverables from process department, those form the basis for carrying out the further engineering by other disciplines.

Say the data sheets prepared by process department, the equipment data sheets or equipment sizings. Those are utilized by the mechanical discipline to carry out their vendor inquiries or to carry out their mechanical design or the equipment. Once the process is well defined, process department can also decide on the capacity of equipment. and based on the capacity, the equipment sizing is done. The number of equipments required of various sizes, those are also defined by the process department. Therefore, they carry out a very crucial role and they form the front bearers of this project or industrial projects.

Another few employees. Another few employees. Important deliverables are the process flow diagrams, the block flow diagrams, the piping and instrumentation line diagrams, the line list and the MTOs. All these deliverables are inputs for other discipline to start their engineering work and therefore these department are always in the forefront. They have to deliver at the first. Since they are the initiators of any engineering project, they play a very major responsibility and they play a very major role in the development of the project. Using the process line list and MTO, even the material takeoff can be, which were estimated during the earlier phases of the project, those can be re-verified or modified suitably as an one required.

Process department provides inputs to instrument engineer for updating the index, the instrumentation index, then to the piping engineers to develop plant layouts, already there has been a layout in the earlier stages of the project. So, during the detail engineering phase or subsequent phases, the piping engineers use the inputs from process department to finally place the plant layout or the plot plan. Also, process engineers, they give input to electrical engineers for the power requirement. Now, we will see another very important discipline, which is the heart of the plant, that is the piping department.

Now, in any petrochemical facility, there are large number of pipes of varied diameter, varied length and they are moving in and out of the plant, carrying fluids and the main responsibility of piping department is to take care of all the inlet and outlet piping. So, this development of an optimized piping system to transport the fluid is the most important responsibility of piping department and it forms the majority of part of this project. Then, on the layout side, it's complete responsibility of piping engineers to develop the layout of the plant.

Even though the layout is based on inputs from other disciplines as well, but the main stakeholder or owner of the plot plan is the piping discipline. And without the piping discipline, there is no other disciplines who can work. Piping gives inputs to all other disciplines and they also receive inputs from other disciplines. This is the most important task which piping discipline does. Piping disciplines also have to check on the material compatibility and requisitions. Like based on the process, piping has to select the material. It has to check the compatibility of the material with respect to the parameters given by process like heat, the type of fluid, temperature, pressure.

All these parameters have to be studied and a suitable material has to be selected. Another important analysis which the piping department does is the piping stress analysis. In piping stress analysis, the diameter, thickness or all the strength parameters of the pipe are analyzed with respect to the pressure and temperature and also with respect to the supporting of the pipes. This analysis is very important not only for piping department, but it also is important for other disciplines to do their design. For example, for civil department, the loading on the structures come from this pipe stress analysis.

So it is very important role which the piping department plays provides input to civil department for structural design, layouts and loading data. To carry out design of any structure, the layout of the structure, the length, width, height and the location of the structure along with the loading data like the piping load data predominantly. We are speaking here that comes from the piping stress analysis and from the piping department. Piping also provides input to mechanical department for the equipment layout and detail. So even though the type of equipment and in-depth design of the equipment is biomechanical, the layout and orientation or say basic sizing of the equipment in the plot plan is given by piping.

Another input which is required for all the disciplines in a project is the layout and details. So this layout and detail is the form of a drawing called as plot plan and the plot plan forms the basis of the design for other disciplines. There are few more disciplines as well apart from piping department. However, piping forms the heart of all the project as far as technical parties comes. Since piping receives input from all other disciplines, processes it and gives input to all the disciplines. Inputs to other disciplines are specific and very precise.

Now the mechanical discipline, this is very important discipline as far as the process is concerned. So any project it is desired to produce some output and in the introduction I said that there are large number of equipments in any project and these equipments are connected with the piping to get in the raw material and get out the output. So therefore, the mechanical department comes into picture to take care of this equipment. Mechanical department prepares equipment data sheets and raises vendor requisitions. Like once the requirements from piping and process is clear to mechanical, based on their engineering judgment, they prepare the equipment data sheet.

They include all the relevant data required for the vendor to design the equipment and give their equipment offer. So this is the main job of mechanical department. A mechanical department may be a static department or a rotary department or a package department. There are sub parts in those departments. This can be a multi-role and overall it comes under mechanical department. Design of equipment with respect to requirement of the project also is the role of mechanical engineers. Mechanical engineers, they provide input to other disciplines for further engineering.

Like mechanical department, they can give input to civil department, electrical department, civil department for the loading of the equipment for the foundation design or for the structural design. It can give the sizing of the equipment for other disciplines so that there is no any clash between other disciplines as far as the base allocation is concerned. Also, it well defines the power requirement of the equipment which is passed on to electrical to make necessary arrangement for the power. Now, another important discipline which comes into picture is the electrical department.

So without power, no project can run. So therefore, this is called the energy house department. It facilitates the power requirement of the project. The electrical department has to provide power to the complete plant. Hence, it has to analyze the total requirement. Also, the area requirement from the source, it has to take the electrical energy from the source and then convert it into a usable parameter and then distribute it within the plant. The efficient transmission and distribution of the required power is the main job of the electrical department.

Now, to transfer this power from the source or from the inlet to the plant to each and every equipment, this is done through cables and these cables have to pass on through the pipe racks or through pipe slippers or they may be even buried type of cables. So arriving at this cable layouts throughout the plant is another task. This is much similar to the piping role, piping department has to take care of all the piping which comes inside and outside the plant. Similarly, electrical department also have to look after the layout of the cables, their sizing, sizes of the ducts or the ancillaries required to carry the cables.

All that has to be designed and the layout throughout the plant has to be prepared. And this has to be ensured that it is free from the other discipline facilities. Now, there is another discipline which comes in parallel with the electrical department. They have quite different role but they look much similar since the cables looks quite similar. Instrumentation department plays a role in controlling the process. Like all these equipments, they are supposed to be working at a specified way. So to ensure that it is working or that process is carried on in the desired way, there are lots of instrumentation attached to the equipments and within the complete project, there are many devices like control valves, flow elements, thermo valves, pressure and safety valves.

So that design is the responsibility of instrumentation department. Another important role is to prepare the level sketch drawing. Now, depending on the process, there are variety of levels within the plant and that is of interest to the instrumentation department. Another important topic is the control and safety system. Any process plant is always expected to run at utmost safety and to take care of that, there is a control and safety. This is the responsibility of instrumentation department. Another important task is the installation procedure of the disk systems. So that is a responsibility of instrumentation engineers.

Want the rest of Basic Structural Engineering Concepts of Industrial Structures?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Basic Structural Engineering Concepts of Industrial Structures course

The remaining 9 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Basic Structural Engineering Concepts of Industrial Structures course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.