Challenge

Week 9 - Project 1 - Door Trim Lower with Engineering Features

Class A surface

tooling axis

tooling axis is in y direction ist normal to surface which extract

Draft Analysis for class A

B surface

Join A and C surface

close surface

door trim with heat stake and locators

Final Draft Analysis

heat stake and 4 way locators are draft with 0.5 degree so we check a draft analysis with 0.4 degree

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.