Challenge

Week 8 - Challenge 2 - Switch Bezel Design

Note: Report PPT is attached.

Class A surface; Draft analysis

Class A surface si cleaing for given tooling axis at 2.9 degree.

Final Solid Part : Draft Analysis

Both Class A and Class C surface are clearing at 2.9 degree

Views With Colur code of Draft Analysis: Class A and Class C Surface=Green at 2.9 Degree, Class B = Blue , Negative angle

Tree Structure:

Final Output:

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.