Week 3 Challenge
RAIL LOADS DEFINED AS PER IRS
1. GAVE IN FOUR LANES IN Z- CO ORDINATES AND X- INCREMENT 0.5
2. LOAD GENERATION = (SPAN+ VEHICLE SPAN )/ (MESH SIZE) = (26+26)/0.5
VEHICLE IS TAKEN AS THE SIZE OF THE SPAN OF THE BRIDGE
RAIL LOADS DEFINED AS PER IRS
1. GAVE IN FOUR LANES IN Z- CO ORDINATES AND X- INCREMENT 0.5
2. LOAD GENERATION = (SPAN+ VEHICLE SPAN )/ (MESH SIZE) = (26+26)/0.5
VEHICLE IS TAKEN AS THE SIZE OF THE SPAN OF THE BRIDGE