Challenge

Week 3 Challenge

1.How hydrology and geotechnical studies (preliminary and detail studies, zone of influence) are used in fixing span  as per IRC standards and type of bridge. Mention the clauses applicable for the same.

Determine the scour depth at the pier and abutment location having silt factor =3

Design discharge = 1000 cumecs

Linear waterway = 128 m

1b.  what measures can be taken to avoid scour at bridge for shallow foundation. Also draw the section of measures on the downstream and the upstream side.

(Note: Draw all the drawings to the scale and neatly)                             

1.c What is uplift and how it can affect the foundation. (loss of contact)

Calculate the uplift in U trough of below section with height 3,4,5 meters. with water level on top of ramp wall level .

What are different measures that can be taken to avoid uplift.

 

This fig above Is part of the question

 

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.