Week -2
1.) Doorbell is Designed using Solenoid element, Switched is controlled using PG with 2 seconds Phase delay.
attached
- Doorbell Simulink design
- PG parameters
- Doorbell scope
2.) Thermistor Modelled to sense the Temperature of a heater. It was tough to understand certain concepts. Tried my best.
attached
- Simulink Model
- SB Parameters