Week 12- Final project
ARM REST
Check Given Class A Surafce for improvement

As shown in above image I have improved given class A surface in surafce workbench by using surafce operation such as extract, extrapolation , trim etc.
Creation of Tooling Axis
Draft Analysis of Class A -
- Creation of Class B Surface -
Class B surface is created by offseting class A surafce by 2.5 mm as per the mastersection.

- Creation of Class C surface
C surface is the connecting surface of Class A and Class B surface. By using Sweep we created the Class C surface.

Creation of Closed Body of Arm Rest

MAP POCKET
Class A Surface and tooling axis -

Draft Analysis on Class A -
- Creation of Class B

- Creation of Class C

- Draft Analysis on Final Body

BOTTLE HOLDER
Class A Surface
- Improved Class A surface


Creation of Tooling Axis and draft analysis

- Creation of Class B

- Creation of Class C

- Solid Body of Bottle holder -

- Draft Analysis on Solid Body of Bottle Holder

LOWER SUBSTRATE
Class A Surafce and tooling axis
- Creation of Class B

- Creation of Class C

- Creation of Solid Body

- Drfat Analysis on Solid Body

