Week 12- Final project


* Need to create a tooling axis on class A surface .then we need to perform draft analysis on the class A surface.
* Create a class B surface which refenece to master section and create a class C surface.
* perform a join operation for class A surface and class C surface to join surfaces.
* perform a trim operation for class B surface and the joined surface ( class A surface and class C surface)
* And perform a draft analysis for the solid surface.
* After performing draft analysis on solid surface . need to create a heat stakes and rib with refrence to master section and perform draft analysis on heat stakes and rib.
* perform a union trim operation for heat stakes and rib.
* create a flanges on surface. distance between 50 to 60 mm.
* And create a dog house and locaters on the suitable surface of the lower substract. and perform draft analysis on the dog house and locaters.
* And perform a union trim or add operation on the heat stakes,dog house ,locaters and flange to the surfaces.
* constrain the push pin on the dog house.