Week 12:- Documentation Challenge
In this challenge, I have added a fixture assembly BOM and BOP list. BOM(Bill of Material) cntains all the standard, manufactured parts and brought out parts that are used in the fixture assembly. It also contains the quantity, material and Make(for Bought outs) of the parts used. It has been made unit wise. Under each unit,parts used in it are mentioned.
In another tab, I have added BOP list of the parts that are used along with their desciption and quantity. They are the parts that we order from outside.