Week 10 - Challenge 3 - Door Trim Lower with Engineering Features
Detailed Report -
1] Creating a Point
2] Create a line by using point direction method
3] Create a B- surface where give 2.5 mm of offset
4] Create a C-surfcace where done sweep & extrapolating opertion
5] join class A & C surface by using join command
6] Make the closed surface
7] Did the final Draft Analysis Report for draft analysis give 2.9 degree celsius.
8] Creating a HEAT STAKES
9] Create Normal to curve plane
10] Create a sketch of hole 7.5 & 5 mm for heat stake
11] Create a locators 4 way type & 2 way type
12] Did the Draft Analysis Report for HEAT STAKE give 0.45 degree celsius.
- Screenshots of the completed design in various orientations (Isometric, Front, Side, and Top View) -
Isometric View -

Front View -

Left Side View -

Right Side View -

Top View -
