Vehicle Ride 1
i.Recommended rear sprung mass frequency based on speed and wheelbase at design condition
Time delay= Wheelbase/Speed
=2.7/26.8224
=0.1006 Sec
The front sprung mass natural frequency target at design is 1.15 Hz
Time for front at target frq = 1/1.15
=0.8695
So require time at rear =Time for front - time delay
=0.8695-0.1006
=0.7689
The rear sprung mass natural frequency :
=1/rear time
=1.3005 Hz






I have attached excel sheet for bump profile for all three conditions for front and rear.