Aim:-To Provide the longitudinal and shear reinforcement for the Given Continuous beams and to calculate the maximum shear force in

Steps to be followed are as shown below

  1. For the given structure go to Analysis and run the structure.
  2. Go to concrete frame design.
  3. Then click on start design / check.
  4. Once the checking of the entire structure is done then click on display design info.
  5. The click on the beam for which we have to provide longitudinal and shear reinforcement.
  6. Concrete Beam design information Tab will be appeared as shown below.
  7. The click on details and then ok.
  8. Design tab will appears as shown below.
  9. Then click on envelope.

10.After the Analysis these are the REinforcement calculations found.

For the # span Continous beam Along Grid A.

Sl.NO

Beam length(m)

Beam Name

Load combination

Load Combination

Maximum longitudinal

Maximum longitudinal

(at Top) in mm^2

(at Bottom) in mm^2

1

5.375

B38

UDcon66

1.5Dl+1.5Bl+1.5ff+1.5Eqy-

1906

953

2

3

B34

UDcon67

1.5Dl+1.5Bl+1.5ff-1.5Eqy-

2045

1022

3

5.5

B33

UDcon67

1.5Dl+1.5Bl+1.5ff-1.5Eqy-

1896

948

Beam 38

Right end

Centre

Left End

Top Reinforcement

1862

477

1906

required at Top

Dia of bars

24

28

28

Number of bars

4.119469027

2.373134328

3.094155844

Top Reinforcement

2464

616

2464

Provided at Top

3#28+1#28

1#28 is provided

3#28+1#28

Beam 38

Right end

Centre

Left End

Bottom Reinforcement

938

789

1020

required

149

231

Dia of bars

24

20

28

Number of bars

1.522727273

Bottom Reinforcement

1256

942

1256

Provided at Top

3#20+ 1#20 extra is provided

3#20 is provided at the centre

3#20+ 1#20 extra is provided

Beam 34

Right end

Centre

Left End

Top Reinforcement

2045

511

2021

required at Top

Dia of bars

28

28

28

Number of bars

2.32

0.829771756

3.280844156

Top Reinforcement

0

615.832

2464

Provided at Top

1#28 i+ 3#28 extra is provide

1#28 is provided

1#28 i+ 3#28 extra is provide

Beam 34

Right end

Centre

Left End

Bottom Reinforcement

1927

511

1945

required

Dia of bars

28

28

28

Number of bars

Bottom Reinforcement

2464

615

2464

Provided at Top

1#28 i+ 3#28 extra is provide

1#28 is provided

1#28 i+ 3#28 extra is provide

Beam 34

Right end

Centre

Left End

Top Reinforcement

1896

474

1873

required at Top

Dia of bars

28

28

28

Number of bars

2.32

0.769690435

3.040584416

Top Reinforcement

2464

616

2164

Provided at Top

1#28 i+ 3#28 extra is provide

1#28 is provided

1#28 i+ 3#28 extra is provide

Beam 34

Right end

Centre

Left End

Bottom Reinforcement

1026

757

940

required

Dia of bars

28

28

28

Number of bars

Bottom Reinforcement

1848

616

1848

Provided at Top

1#28 i+ 2#28 extra is provide

2#28 is provided

1#28 + 2#28 extra is provide

For the 7m span Continous beam Along Grid A.
Sl.NO Beam length(m) Beam Name Load combination Load Combination Maximum longitudinal Maximum longitudinal
(at Top) in mm^2 (at Bottom) in mm^2
1 4.5 B24 UDcon57 1.5Dl+1.5Bl+1.5ff-1.5Eqx 1408 704
2 4.5 B25 UDcon56 1.5Dl+1.5Bl+1.5ff+1.5Eqx 1308 654
3 8 B69 UDcon56 1.5Dl+1.5Bl+1.5ff+1.5Eqx 1938 969
4 8 B70 UDcon57 1.5Dl+1.5Bl+1.5ff-1.5Eqx 1940 970
5 8 B73 UDcon57 1.5Dl+1.5Bl+1.5ff-1.5Eqx 1425 713
6 4 B14 UDcon57 1.5Dl+1.5Bl+1.5ff-1.5Eqx 1304 650
7 4 B16 UDcon56 1.5Dl+1.5Bl+1.5ff+1.5Eqx 1367 684

Beam 24

Right end

Centre

Left End

Top Reinforcement

1408

480

1305

required at Top

Dia of bars

28

28

28

Number of bars

2

0.780487805

2.118506494

Top Reinforcement

1847.496

615.832

1847.496

Provided at Top

1#28 + 2#28 is provide

1#28 is provided

1#28 + 2#28 is provide

Beam 24

Right end

Centre

Left End

Bottom Reinforcement

916

605

878

required

149

273

Dia of bars

16

28

28

Number of bars

#DIV/0!

1.425324675

Bottom Reinforcement

1018.008

615.831

1018.008

Provided at Top

2#16+ 1#28 extra is provided

1#28 is provided at the centre

2#16+ 1#28 extra is provided

Beam 25

Right end

Centre

Left End

Top Reinforcement

1237

476

1308

required at Top

Dia of bars

28

28

28

Number of bars

0.772938074

2.123376623

Top Reinforcement

1231.664

615.832

0

Provided at Top

1#28 i+ 1#28 extra is provide

1#28 is provided

1#28 i+ 1#28 extra is provide

Beam 25

Right end

Centre

Left End

Bottom Reinforcement

933

546

918

required

Dia of bars

28

28

28

Number of bars

Bottom Reinforcement

930

615.832

930

Provided at Top

1#28 i+1#20 extra is provide

1#28 is provided

1#28 i+1#20 extra is provide

Beam 69

Right end

Centre

Left End

Top Reinforcement

1903

485

1938

required at Top

Dia of bars

28

28

28

Number of bars

2.32

0.787552449

3.146103896

Top Reinforcement

2464

615.832

2464

Provided at Top

1#28 i+ 3#28 extra is provide

1#28 is provided

1#28 i+ 3#28 extra is provide

Beam 69

Right end

Centre

Left End

Bottom Reinforcement

953

1501

969

required

Dia of bars

22

22

20

Number of bars

Bottom Reinforcement

1143

1524

1143

Provided at Top

3#22 is provide

3#22 +1#22 extra is provide

3#22 is provide

Beam 70

Right end

Centre

Left End

Top Reinforcement

1940

485

1909

required at Top

Dia of bars

28

28

28

Number of bars

2.32

0.787552449

3.099025974

Top Reinforcement

2463.328

615.832

2463.328

Provided at Top

1#28 i+ 3#28 extra is provide

1#28 is provided

1#28 i+ 3#28 extra is provide

Beam 70

Right end

Centre

Left End

Bottom Reinforcement

970

1498

954

required

Dia of bars

22

22

20

Number of bars

Bottom Reinforcement

1143

1520

1143

Provided at Top

3#22 is provide

3#22 +1#22 extra is provide

3#22 is provide

Beam 73

Right end

Centre

Left End

Bottom Reinforcement

1425

356

1349

required

Dia of bars

22

22

20

Number of bars

Bottom Reinforcement

1520.728

380.182

1520.728

Provided at Top

1#22+3#22 extra is provide

1#22 is provide

1#22+3#22 extra is provide

Beam 73

Right end

Centre

Left End

Bottom Reinforcement

722

502

734

required

Dia of bars

28

28

28

Number of bars

Bottom Reinforcement

816

615.832

816

Provided at Top

1#28+1#16 extra is provide

1#28 is provide

1#28+1#16 extra is provide

Beam 14

Right end

Centre

Left End

Bottom Reinforcement

1301

419

1286

required

Dia of bars

24

28

24

Number of bars

Bottom Reinforcement

1356

452

1356

Provided at Top

1#24 +2#24 extra is provide

1#24 is provide

1#24 +2#24 extra is provide

Beam 14

Right end

Centre

Left End

Bottom Reinforcement

1056

516

1052

required

Dia of bars

24

28

24

Number of bars

Bottom Reinforcement

1068.28

615.832

1068.28

Provided at Top

1#28+1#24 extra is provide

1#28 is provide

1#28+1#24 extra is provide

Beam 16

Right end

Centre

Left End

Bottom Reinforcement

1265

457

1367

required

Dia of bars

22

28

20

Number of bars

Bottom Reinforcement

1376.196

615.832

1376.196

Provided at Top

1#28+ 2#22 is provide

1#28

1#28+ 2#22 is provide

Beam 16

Right end

Centre

Left End

Bottom Reinforcement

1042

558

1105

required

Dia of bars

22

28

20

Number of bars

489.168

Bottom Reinforcement

1243.832

615.832

1243.832

Provided at Top

1#28+2#20 is provide

1#28

1#28+2#20 is provide

SHEAR STEEL

Shear force in kN

13.05

16.05

209.4525

12.05

16.05

193.4025

14.45

16.05

231.9225

14.45

16.05

231.9225

13.67

16.05

219.4035

13.15

16.05

211.0575

13.08

16.05

209.934

The maximum shear force required was found to be 231.922 kN

The maximum shear force required was found to be 231.922 kN

Vus=0.87*415*150.79*8/100

Vus=274.4kN

Asv=3.142*8*8*3/4

Asv=150.79

Hence 3 legged 8 m dia bars are provided @ 100 mm c/c in maximum shear zone and @150 mm c/c in the remaining area.

It is noted that the central span of Grid A RC beam is nearly failing due to higher shear stress.As per the above shear force values ( 3.08Mpa) against the maximum allowable shear stress ( 3.10MPa) is almost failing but passes numerically. This design shear force is arrived I philosophy of capacity design concept. This can be resolved in any of the following procsess.

  1. Optimizing the provided flexural reinforcement.
  2. Reducing the depth of the Rc beam which in turn reduces the stiffness and flexural requirement
  3. Increasing concrete grade will increase allowable shear stress limit

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.