Project 2 - V&V SW Analysis II
Answer 1(a):
The test manger report for the static analysis of the file Testrain.c is attached below as jpeg 1.0, 1.1 and 1.2:
Answer 1(b):
The flowgraph and test case generation midway through the integration test are attached below as jpeg 2.0 and 2.1.
The result of the completed test and regression report for the cashregister.c file is attached below as jpeg 3.0, 3.1 and 3.2.
The dynamic coverage analysis report is attached below as jpeg 4.0, 4.1, 4.2 and 4.3.
The test manager report of the completed integration test is attached below as jpeg 5.0, 5.1 and 5.2.