Project 1 - V&V SW Analysis - I
1. Introduction
Objective: To ensure the new mobile phone meets the specified requirements through blackbox testing and is ready for User Acceptance Testing (UAT).
Scope: This test plan covers functional testing of the mobile phone based on the user stories provided. It includes all necessary details to ensure thorough testing of the specified features.
2. Test Items
- Power button functionality
- UI components and layout
- Application icons and grid
- Font style and size
- Touch responsiveness
- Absence of hard buttons
3. Features to be Tested
- Powering on and off the phone
- Display of company logo on startup
- Display and layout of app icons
- Presence of specific icons in the bottom bar
- Functionality of "call the phone" and "Dictionary" icons
- Font consistency
- Touch responsiveness
- Confirmation of no hard buttons
4. Features Not to be Tested
- Internal hardware components (e.g., battery life, signal strength)
- Non-UI-based functionalities (e.g., security features, background processes)
- Network connectivity performance
5. Approach
Testing Types:
- Functional Testing
- UI Testing
- Usability Testing
Testing Method: Manual testing will be employed for all specified user stories. Test cases will be designed based on the requirements and executed to validate the expected outcomes.
6. Test Cases
US-1: Power Button Long Press to Switch On
- Test Case 1.1: Long press the power button.
- Expected Result: The phone switches on, displaying the company logo at the center of the screen.
US-2: Power Button Press to Show App Icons
- Test Case 2.1: Press the power button to switch on the phone.
- Expected Result: The phone switches on, displaying all app icons in a grid.
US-3: "Call the Phone" Icon Position
- Test Case 3.1: Power on the phone.
- Expected Result: The "call the phone" icon appears as the first icon at the bottom bar of the screen.
US-4: "Dictionary" Icon Position
- Test Case 4.1: Power on the phone.
- Expected Result: The "Dictionary" icon appears as the second icon at the bottom bar of the screen.
US-5: "Call the Phone" Icon Functionality
- Test Case 5.1: Click the "call the phone" icon.
- Expected Result: All contacts are displayed in chronological order.
US-6: "Dictionary" Icon Functionality
- Test Case 6.1: Click the "Dictionary" icon.
- Expected Result: A search bar appears in the middle of the screen to search for word meanings.
US-7: Power Button Long Press to Switch Off
- Test Case 7.1: Long press the power button.
- Expected Result: The phone switches off, displaying a "Good-Bye" message.
US-8: Font Style and Size
- Test Case 8.1: Power on the phone and navigate through the UI.
- Expected Result: The font style is "Calibri (Body)" and the font size is 12.
US-9: Touch Responsiveness
- Test Case 9.1: Interact with the UI elements (icons, buttons, etc.).
- Expected Result: The UI is touch responsive.
US-10: Absence of Hard Buttons
- Test Case 10.1: Inspect the physical design of the phone.
- Expected Result: No hard buttons are present on the phone.
7. Test Environment
Hardware:
- The new mobile phone model (under development)
Software:
- Operating system and pre-installed applications as specified
Tools:
- None (manual testing)
8. Entry and Exit Criteria
Entry Criteria:
- Mobile phone is available for testing.
- All necessary software is installed and functional.
Exit Criteria:
- All test cases have been executed.
- All critical and major defects have been resolved.
- Test results have been documented and reviewed.
9. Test Deliverables
- Test Plan Document
- Test Cases Document
- Test Execution Reports
- Defect Reports
- Test Summary Report
10. Schedule
Planning Phase:
- 1 week
Test Case Development:
- 2 weeks
Test Execution:
- 3 weeks
Defect Resolution and Re-testing:
- 2 weeks
Final Review and Reporting:
- 1 week
11. Resources
Personnel:
- Test Manager
- Test Engineers
Tools:
- None required (manual testing)
12. Risks and Mitigation
Potential Risks:
- Delays in development leading to postponed testing
- Insufficient test coverage due to missing requirements
Mitigation Strategies:
- Regular communication with the development team
- Review and update test cases based on any new requirements
13. Approval
This test plan is approved by the Product Owner and Test Manager and will be reviewed and updated as necessary throughout the testing process.