Project 1 - V&V SW Analysis - I
Here is a test plan for the features of the new mobile phone, focusing on black-box testing:
1. Objective: To verify that the new phone meets the necessary specifications and performs exactly as intended.
2. Scope: This test plan covers the black-box testing of the following features
· Powering ON and OFF the phone
· Displaying icons on the home screen
· Functionality of the “call the phone” icon
· Functionality of the “Dictionary” icon
· Font and size setting
· Touch responsiveness
3. Test Environment:
· Emulator or physical device for testing
4. Test Cases:
|
|
Action (As a product owner) |
Expected Result (As a product owner) |
Action (As a customer) |
Expected Result (As a customer) |
|
Powering on the phone |
Long press the power button |
the phone switches on with the company logo displayed at the centre of the screen |
Power On the phone |
All app icons are present in the grid on the home screen |
|
Call the phone |
Power on the phone |
The “call the phone” icon is the first icon at the bottom bar of the screen |
||
|
Click the “call the phone” icon |
All contacts are visible in chronological order |
|||
|
Dictionary icon |
Power ON the phone |
The "Dictionary" icon is the second icon at the bottom bar of the screen |
||
|
"Dictionary" icon |
A search bar appears in the middle of the screen to search for word meanings. |
|||
|
Powering OFF the phone |
Long press the power button |
The phone switches OFF with a “Good-bye” messaged displayed |
||
|
Font and size settings |
Check the font and size settings in the phone's UI |
The font is set to "Calibri (Body)" and size 12. |
||
|
Touch responsiveness |
Use various touch gestures (tap, swipe, pinch) on the phone's screen |
The UI responds accurately and promptly to touch inputs |
5. Test Execution:
· Test cases will be executed manually and automatically
· Test results will be recorded, including any deviations from expected behaviour
6. Defect reporting:
· Any deviations from expected results will be reported using a standardized format
· Defect will be categorized based on severity and priority
7. Test Deliverables:
· Test plan document
· Test case document
· Test execution report
· Defect report
8. Risk and mitigation:
Risk: Hardware limitation affecting touch responsiveness
Mitigation: Ensure testing is done on compatible devices with adequate hardware specification
Risk: Inconsistencies in front and size setting across different screens
Mitigation: Verify front and size setting on multiple screens during testing
9. Conclusion:
The objective of this test plan is to confirm that the new phone satisfies the standards and offers an excellent user experience. By adhering to this method, problems can be found and fixed before the product is made available for user acceptability testing.