Challenge

Project 1 - V&V SW Analysis - I

Here is a test plan for the features of the new mobile phone, focusing on black-box testing:

1. Objective: To verify that the new phone meets the necessary specifications and performs exactly as intended.

2. Scope: This test plan covers the black-box testing of the following features

· Powering ON and OFF the phone

· Displaying icons on the home screen

· Functionality of the “call the phone” icon

· Functionality of the “Dictionary” icon

· Font and size setting

· Touch responsiveness

3. Test Environment:

· Emulator or physical device for testing

4. Test Cases:

Action

(As a product owner)

Expected Result

(As a product owner)

Action

(As a customer)

Expected Result (As a customer)

Powering on the phone

Long press the power button

the phone switches on with the company logo displayed at the centre of the screen

Power On the phone

All app icons are present in the grid on the home screen

Call the phone

Power on the phone

The “call the phone” icon is the first icon at the bottom bar of the screen

Click the “call the phone” icon

All contacts are visible in chronological order

Dictionary icon

Power ON the phone

The "Dictionary" icon is the second icon at the bottom bar of the screen

"Dictionary" icon

A search bar appears in the middle of the screen to search for word meanings.

Powering OFF the phone

Long press the power button

The phone switches OFF with a “Good-bye” messaged displayed

Font and size settings

Check the font and size settings in the phone's UI

The font is set to "Calibri (Body)" and size 12.

Touch responsiveness

Use various touch gestures (tap, swipe, pinch) on the phone's screen

The UI responds accurately and promptly to touch inputs

5. Test Execution:

· Test cases will be executed manually and automatically

· Test results will be recorded, including any deviations from expected behaviour

6. Defect reporting:

· Any deviations from expected results will be reported using a standardized format

· Defect will be categorized based on severity and priority

7. Test Deliverables:

· Test plan document

· Test case document

· Test execution report

· Defect report

8. Risk and mitigation:

Risk: Hardware limitation affecting touch responsiveness

Mitigation: Ensure testing is done on compatible devices with adequate hardware specification

Risk: Inconsistencies in front and size setting across different screens

Mitigation: Verify front and size setting on multiple screens during testing

9. Conclusion:

The objective of this test plan is to confirm that the new phone satisfies the standards and offers an excellent user experience. By adhering to this method, problems can be found and fixed before the product is made available for user acceptability testing.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.