Project 1 - V&V SW Analysis - I
Test plan
- Test objective:When the phone is switched on after long press of button should display the apps icons,font size should be 12 in calibri,UI touch responsive and no hard buttons.
- Scope of testing:The mentioned apps should perfom the required operations.
- Insope: Dictionary icon should provide search bar,power on button shall switch off phone and call the phone" icon ,all the contacts shall be visible based on chronological order.
- Out of scope: Mobile phone should have no hard buttons.
- Roles and responsibilities: Team A is assigned for testing out the required process
- Schedule of testing: 3 weeks from the starting date 17-02-2024
- Assumptions: Unique software testing required to perform testing on the buitl in apps of the ready made phone
- Risk:Hardware Availabilityand Developer assistance when required.
- Test methodology: Control flow test, Elementary comparision test
- Test Automation:
if(long pressed the power button of the phone)
{
print..company logo at the center of the screen;
}
Else
{
print..Long press the phone;
}
if(pressed the power button AND phone is switched ON)
{
All icons of apps shall appear in grid;
}
Else
{
press the power button to turn on phone;
}
if (phone is powered ON)
{
Display first icon at the bottom bar of my screen = Call the phone;
Display second icon at the bottom bar of my screen = Dictionary;
}
else
{
Power ON the phone;
}
if( phone is Powered ON AND Clicked my "call the phone" icon)
{
Display the contacts in chronological order;
}
else
{
power the phone ON and click call the phone icon;
}
if( phone is Powered ON AND Clicked Dictionary icon)
{
Display search bar at the middle of the screen to search desired word;
}
else
{
power the phone ON and click Dictionary icon;
}
if(long pressed on power ON button)
{
Display Good bye message ;
Switch off the phone;
}
else
{
Display if you want to switch off Long press the Power ON button;
}
if(Phone is Powered ON)
{
Font = Calibri(Body);
Font_size= 12;
UI interface should be touch responsive;
No hard buttons on phone other than power ON;
}
- Defect tracking: By linking JIRA
- Deliverables: It is the outcome from the testing team and that is to be given to the customers at the end of the project
Before the testing phase:
- Test plan document.
- Test case document
- Test design specification
During the testing phase
- Test scripts
- Test data
- Error logs
After the testing phase
- Test Reports
- Defect Report
- Installation Report