Challenge

Project 1 - V&V SW Analysis - I

Test plan

  • Test objective:When the phone is switched on after long press of button should display the apps icons,font size should be 12 in calibri,UI touch responsive and no hard buttons.
  • Scope of testing:The mentioned apps should perfom the required operations.
  • Insope: Dictionary icon should provide search bar,power on button shall switch off phone and call the phone" icon ,all the contacts shall be visible based on chronological order.
  • Out of scope: Mobile phone should have no hard buttons.
  • Roles and responsibilities: Team A is assigned for testing out the required process
  • Schedule of testing: 3 weeks from the starting date 17-02-2024
  • Assumptions: Unique software testing required to perform testing on the buitl in apps of the ready made phone
  • Risk:Hardware Availabilityand Developer assistance when required.
  • Test methodology: Control flow test, Elementary comparision test
  • Test Automation:

if(long pressed the power button of the phone)

{

print..company logo at the center of the screen;

}

Else

{
print..Long press the phone;

}

if(pressed the power button AND phone is switched ON)

{

All icons of apps shall appear in grid;

}

Else

{

press the power button to turn on phone;

}

if (phone is powered ON)

{

Display first icon at the bottom bar of my screen = Call the phone;

Display second icon at the bottom bar of my screen = Dictionary;

}

else

{

Power ON the phone;

}

if( phone is Powered ON AND Clicked my "call the phone" icon)

{

Display the contacts in chronological order;

}

else

{

power the phone ON and click call the phone icon;

}

if( phone is Powered ON AND Clicked Dictionary icon)

{

Display search bar at the middle of the screen to search desired word;

}

else

{

power the phone ON and click Dictionary icon;

}

if(long pressed on power ON button)

{

Display Good bye message ;

Switch off the phone;

}

else

{

Display if you want to switch off Long press the Power ON button;

}

if(Phone is Powered ON)

{

Font = Calibri(Body);

Font_size= 12;

UI interface should be touch responsive;

No hard buttons on phone other than power ON;

}

    • Defect tracking: By linking JIRA
    • Deliverables: It is the outcome from the testing team and that is to be given to the customers at the end of the project

Before the testing phase:

      • Test plan document.
      • Test case document
      • Test design specification

During the testing phase

      • Test scripts
      • Test data
      • Error logs

After the testing phase

    • Test Reports
    • Defect Report
    • Installation Report
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.