Project 1 - V&V SW Analysis - I
Project 1 - V&V SW Analysis - I
Write a Test plan to test features of a new mobile phone (Blackbox test) that needs to be implemented based on the following requirements. (The product is still under development stage and is yet to be UA (User Acceptance ) tested .Every other thing to be included in the test plan can be hypothetical.
US-1:As a Product owner,when long pressed the power button of the phone shall switch on with a company logo at the center of the screen.
US- 2: As a Customer,when the power button is pressed my phone is switched ON and all my icons of the APPS shall be present in the grid
US- 3: As a Product owner,when the phone is powered ON ,I shall see the "call the phone" icon as the first icon at the bottom bar of my screen.
US- 4: As a Product owner,when the phone is powered ON, I shall see the "Dictionary" icon as the second icon at the bottom bar of my screen.
US- 5: As a Product owner,when I Clicked my "call the phone" icon ,all the contacts shall be visible based on chronological order.
US- 6: As a Product owner,when I Clicked my "Dictionary icon ,a search bar shall appear at the middle of the screen to let me search the meanings of the words I desire.
US- 7: As a Product owner,when I long pressed my "power on" button ,my phone shall be switched off saying "Good-Bye” Message.
US-8: As a product owner ,my font in the mobile shall always be ''calibri (Body)" and shall be of size 12.
US-9:As a Customer,I need my UI to be touch responsive.
US-10: As a customer ,my mobile phone should have no hard buttons.
Answer:
Test Plan for New Mobile Phone (Blackbox Test)
- Introduction
- Provide an overview of the test plan and its objectives.
- Define the scope of testing, specifying the features and requirements to be tested.
- Identify the target audience (Product owner and Customer) for each requirement.
- Test Environment
- Specify the hardware and software requirements for the test environment.
- List the devices, operating systems, and versions to be tested.
- Test Strategy
- Define the overall approach for testing the mobile phone.
- Determine the testing techniques to be used (blackbox testing).
- Identify the types of testing to be performed (functional testing, UI testing, etc.).
- Test Scenarios
- Identify and describe the specific test scenarios for each user story requirement.
- Include both positive and negative test cases for comprehensive coverage.
- Define the expected results for each test scenario.
- Test Execution
- Describe the process for executing the test scenarios.
- Specify any prerequisites or setup steps required for testing.
- Document the steps to reproduce each test scenario.
- Capture actual results and compare them against the expected results.
- Report any deviations or defects encountered during testing.
- Test Coverage
- Ensure that all user stories and their associated requirements are covered.
- Verify that each feature and functionality is thoroughly tested.
- Track the progress of testing to ensure completion of all test scenarios.
- Test Data
- Define the test data needed for executing the test scenarios.
- Include sample contacts for testing the "call the phone" icon (US-5).
- Prepare a list of words to test the search functionality in the "Dictionary" icon (US-6).
- Test Execution Schedule
- Create a timeline for executing the test scenarios.
- Allocate resources and define responsibilities for testing.
- Determine the sequence of test scenarios based on dependencies.
- Test Logs and Reporting
- Document the test execution results and any issues encountered.
- Maintain a log of defects and track their status until resolution.
- Generate test reports summarizing the test coverage and results.
- Risk Assessment
- Identify potential risks and their impact on testing.
- Define mitigation strategies to address the identified risks.
- Continuously monitor and manage risks throughout the testing process.
- Test Completion Criteria
- Define the criteria for determining when testing is considered complete.
- Specify the exit criteria for each user story requirement.
- Ensure that all critical and high-priority defects are resolved.
- Conclusion
- Summarize the test plan and its objectives.
- Provide any additional remarks or recommendations.
- Sign off on the test plan to indicate readiness for testing.
Note: This test plan provides a high-level structure and guidelines for testing the specified requirements. The actual test scenarios, steps, and data should be further detailed based on the specific implementation and context of the mobile phone under development.
Here's a revised version of the Test Plan for the new mobile phone, incorporating the requirements provided:
Test Plan for New Mobile Phone (Blackbox Test)
- Introduction
- Provide an overview of the test plan and its objectives.
- Define the scope of testing, specifying the features and requirements to be tested.
- Identify the target audience (Product owner and Customer) for each requirement.
- Test Environment
- Specify the hardware and software requirements for the test environment.
- List the devices, operating systems, and versions to be tested.
- Test Strategy
- Define the overall approach for testing the mobile phone.
- Determine the testing techniques to be used (blackbox testing).
- Identify the types of testing to be performed (functional testing, UI testing, etc.).
- Test Scenarios
- Requirement: US-1
- Scenario 1: Long press power button when the phone is off.
- Scenario 2: Long press power button when the phone is already on.
- Scenario 3: Verify the presence of the company logo on the screen.
- Requirement: US-2
- Scenario: Press power button and verify the presence of all app icons in the grid.
- Requirement: US-3
- Scenario: Power on the phone and confirm the presence of "call the phone" icon as the first icon on the bottom bar.
- Requirement: US-4
- Scenario: Power on the phone and validate the presence of "Dictionary" icon as the second icon on the bottom bar.
- Requirement: US-5
- Scenario: Click "call the phone" icon and ensure that contacts are visible in chronological order.
- Requirement: US-6
- Scenario: Click "Dictionary" icon and verify the appearance of a search bar in the middle of the screen.
- Requirement: US-7
- Scenario: Long press power button and confirm the phone is switched off with a "Good-Bye" message.
- Requirement: US-8
- Scenario: Verify that the font in the mobile is always "calibri (Body)" and of size 12.
- Requirement: US-9
- Scenario: Validate the touch responsiveness of the user interface.
- Requirement: US-10
- Scenario: Ensure that no hard buttons are present on the mobile phone.
- Test Execution
- Describe the process for executing the test scenarios.
- Specify any prerequisites or setup steps required for testing.
- Document the steps to reproduce each test scenario.
- Capture actual results and compare them against the expected results.
- Report any deviations or defects encountered during testing.
- Test Coverage
- Ensure that all user stories and their associated requirements are covered.
- Verify that each feature and functionality is thoroughly tested.
- Track the progress of testing to ensure completion of all test scenarios.
- Test Data
- Define the test data needed for executing the test scenarios.
- Prepare sample contacts for testing the "call the phone" icon (US-5).
- Create a list of words to test the search functionality in the "Dictionary" icon (US-6).
- Test Execution Schedule
- Create a timeline for executing the test scenarios.
- Allocate resources and define responsibilities for testing.
- Determine the sequence of test scenarios based on dependencies.
- Test Logs and Reporting
- Document the test execution results and any issues encountered.
- Maintain a log of defects and track their status until resolution.
- Generate test reports summarizing the test coverage and results.
- Risk Assessment
- Identify potential risks and their impact on testing.
- Define mitigation strategies to address the identified risks.
- Continuously monitor and manage risks throughout the testing process.
- Test Completion Criteria
- Define the criteria for determining when testing is considered complete.
- Specify the exit criteria for each user story requirement.
- Ensure that all critical and high-priority defects are resolved.
- Conclusion
- Summarize the test plan and its objectives.
- Provide any additional remarks or recommendations.