Project 1 - V&V SW Analysis - I
Abinaya batch
Q Ans:- Test plan
It is detailed documentation that provides information about all the necessary resources and activities that will be a part of SW/HW testing.
• Test plans are necessary documentation used in both black box and white box testing.
• It has various attributes detailing the Test Objective, Scope of Testing, Roles and Responsibilities, Schedule of Tests, Assumptions, Risks, Mitigation/Contingency Plans, In-scope Features, Out-of-scope Features, Test Methodology, Test Approach, Entry Criteria, Exit Criteria, Defect Tracking, Test Environments, Test Automation, Effort Estimation, and Test Deliverables.
Black box testing:
Without looking into the internal implementation of the structures of the system..
Ans (US-1:)
if (when long pressed the power button of the phone)
{
Phone shall switch on with a company logo at the center of the screen
}
Ans (US- 2:) if(when the power button is pressed in my phone)
{
my phone is switched ON and all my icons of the APPS shall be present in the grid
}
Ans (US- 3:)
if (when the phone is powered ON)
{
I shall see the "call the phone" icon as the first icon at the bottom bar of my screen
}
Ans (US- 4:)
if (when the phone is powered ON)
{
I shall see the "Dictionary" icon as the second icon at the bottom bar of my screen
}
Ans (US- 5:)
if (I Clicked my "call the phone" icon )
{
all the contacts shall be visible based on chronological order
}
Ans (US- 6:)
if (when I Clicked my "Dictionary icon )
{
a search bar shall appear at the middle of the screen to let me search the meanings of the words I desire
}
Ans (US- 7:)
if(when I long pressed my "power on" button )
{
my phone shall be switched off saying "Good-Bye” Message
}
Ans (US-8:)
if (my font in the mobile shall always be ''calibri (Body)"
{
if(font size shall be of size 12)
Ans US-9:
while ( my UI to be touch responsive)
AnsUS-10:
if (my mobile phone should have hard buttons)