Project 1
Q1)
BH - Bore hole for 10m
CPT - Cone Penetration Test - 30m
PLT - Plate load test - 2B - twice the base diamater
TP - Trial Pits - 3m
DEPTH AND LOCATION OF PILE
Points can be placed outside the plot area if permissible.
The arrangement of poits outside should not obstruct the public.
Investigation points must be spaced properly.
the location of pile also depends on type of structure and loads acting on it

