Challenge

Project 1

Following steps followed for harness and drawing creation:-

  1. Made a assembly product and uploaded Door 3D data and all required connectors and placed them at desired location
  2. Guiding channel installed at door
  3. Electrically defined the assy using geometrical bundle command
  4. Did routing in "Electrical harness assy" workbench
  5. After routing saved the work
  6. Made a new product file for flattening and defined flattening parameters
  7. Uploaded harness assy in flattened product
  8. Flattened the harness
  9. Saved flattened file
  10. Uploaded flattened harness in drawing
  11. Gave a frame to drawing
  12. Saved catia drawing file
  13. made pdf of drawing file
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.