Challenge

Identification of Cracks

1)a.Observation concrete cruushed and the the reinforcement is exposed.

Concrete spalled beyond the reinforcement which may be a sign of rupture.

Beam top portion looks safe because of the flange advanced from the slab

The crack develops from bottom to top means rebar yielding occurs in support bottom only.

Answer

Its form of flexural failure due to reversal of stress during eathquake

During stress reversal, support top experiences compression and bottom experiences tension.

Top compression is managed by slab advantage. Bottom tension was not satisfied by the providded reinforcement.

Since the reinforcement got yielded, it can not be replaced.

2)b.Observations

Cracks along the beam column edge.

Cracks seem to be have developed through the structure as it looks much wider.

Beam looks seperated from the column at the joints.

concreet is not severely crushed.

Answer:

Its beam pull out failure due to insufficient development length of reinforcement in joints

During earthquake, The horizontal movements of structure makes this condition worse and detached the beam member from column

Providing anchorage length between two existing concrete is very difficult. So not repairable

1(c) Observations

cracks are exactly at the joints of column and beam

cracks in beam developed through its entire width

slab also developed more cracks along the beam width direction

Answer

Its aplastic hinge failure

The damage occured in only in the joint zone first of all

Cyclic lateral loading & stress reversal at the joints led to the damage

Even the slab participated to its best to handle the tension (slab is severely cracked means it has undergone tension with its flange condition) But unable to control the damage

The joint can be strentheed

2(1)Observations

Concrete damage at the top of the column

Concrete damaged all around the column face

Beams are safe

The location of column looks at edge of the building

The walls are built along the column means it is probably at ground floor , for parking car movements access

Answer

It's a soft storey failure, technically plastic hinge formation.

Due to absence of infill walls at the ground floor.the plastic hinge forms at the top of ground storey columns during lateral movement.

Based on the deevelopment of crush of concrete, It can either be repairable or non-repairable

2(b) Observation

Concrete developed complete breakage diagonally

Longitudinal reinforcements are intact

shear reinforcement spacing looks wider (which means Probably lesser shear rebarprovided)

Answer

It's a pure shear failure

Inadequate shear reeinforcement compells concrete takes all the shear stresses

2(c) Observations

Column failure completely

Failure at top of column.

There are two slabs connnected to the column , probably one at mid height of the column.

The wooden piles might be a post failure support after column failed, providing temperary prop to avoid collapse of the entire structure.

Answer:

Its a short column faire

An additional slab or a beam connected to a column in mid height leads to the effect

This leads to failure especally if the connection is unintentional and not accounted in design

The failure given in the picture is not at all repairable.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.