            1. a) 
              
                OBSERVATIONS :

  • Concrete crushed and the reinforcement is exposed.
  • Concrete spalled beyond the reinforcement which may be a sign  of rupture.
  • Beam top portion looks safe because of the flange advanatage from slab.
  • The crack develops from bottom to top means rebar yilding occurs in support bottom only.

            ANSWER :

  • It's form of flexural failure due to reversal of stress during earthquake.
  • During stress reversal,support top experiences compression and bottom experiences tension.
  • Top compression is managed by slab advantage.Bottom tension was not satisfied by the provided reinforcement.
  • Since the reinforcement got yielded,it can not be repaired.

           b)

           OBSERVATIONS :

  • Cracks along Beam - Column edge.
  • Cracks seem to have developed through the structure as it looks much wider.
  • Beam looks separated from the column at joints.
  • Concrete is not severely crushed.

           ANSWER :

  • It's Beam pull out of failure due to insufficient development length of reinforcement in joints.
  • During earthquake,The horizontal movement of structure makes this condition worse and detached the beam member from column.
  • Providing anchorage length between two existing concrete is very difficult.So not repairable.

         c)

          OBSERVATIONS :

  • Cracks are exactly at the joint of Column-Beam.
  • Cracks in beam developed through its entire width.
  • Slab also developed more cracks along the beam width direction.

         ANSWER :

  • It's a plastic hinge failure.
  • The damage occurred only in the joint zone.
  • Cyclic lateral loading and stress reversal at the joints led to the damage.
  • Even the slab participated to its best to handle the Tension (slab is severely cracked means it has undergone tension with its flange condition),But unable to control the damage.
  • The joint can be strengthened.

     2.a)

       OBSERVATIONS :

  • Concrete damaged at top of a column.
  • Conrete damaged all around the column face.
  • Beams are safe.
  • The location of column looks at edge of the building.
  • No walls are built along the column means it is probably at Ground floor,for Parking Car movement access.

        ANSWER :

  • It's a Soft storey failure,technically Plastic hinge formation.
  • Due to absence of infill walls at the Ground floor,The plastic hinge forms at the Top of ground storey columns during Lateral Movement.
  • Based on the development of crush of concrete,it can either be repairable or Non-repairable.

     b)

       OBSERVATIONS :

  • Concrete developed complete breakage diagonally.
  • Longitudinal reinforcements are intact.
  • Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)

       ANSWER :

  • It's a Pure Shear failure.
  • Inadequate shear reinforecement compels concrete takes all the shear stressess.

     c)

       OBSERVATIONS :

  • Column failed completely.
  • Failure at top of column.
  • There are two slabs connected to the column,Probably one at mid height of the column.
  • The wooden piles might be a Post failure support after column failed,providing temporary prop to avoid collapse of the entire structure.

      ANSWER :

  • It's a Short Column failure.
  • An additional slab or a Beam connected to a column in mid-height leads to this effect.
  • This leads to failure especially if the connection is unintentional and not accounted in design.
  • The failure given in the picture is not at all repairable.

          
        
                 
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.