Identification of Cracks

(1)a. The concrete crushed and spalled out of reinforcement which might be a case of rupture failure.Beam top is safe due to flange advantage.During stress reversal, top compression is managed by slab but bottom tension could not be managed by the reinforcment.   It can not be repaired as the reinforcement got…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Murugesan MURUGESAN (19)

    Project 1

    Objective:

                   1.         I.    DESIGN BASIS REPORT           3D ELEVATION OF G + 6 + ROOF     1.    GENERAL CHARACTERISTICS OF PROJECT     Project Description Project     …

    calendar

    25 Feb 2024 03:20 PM IST

    • DESIGN
    Read more

    Week 3 Challenge

    Objective:

    CHALLENGE - 3 Q1. 1.    State the primary load cases to be considered for design. The primary load cases that are to be considered for design are listed below: Dead Load (IS 875: Part I). Live Load (IS 875: Part II). Wind Load (IS 875: Part III). Snow Load (IS 875: Part IV). Seismic Load…

    calendar

    26 Nov 2023 01:37 PM IST

      Read more

      Week 2 Challenge

      Objective:

      CHALLENGE – 2 Answers        : Q : 1             1. Ø  Open staad. software and fillup details like file name, location, unit and in job  information fill-up all required data. Ø  Keep unit as a…

      calendar

      21 Nov 2023 02:52 PM IST

      Read more

      Week 1 Challenge

      Objective:

        CHALLENGE – 1 Answers     : Q1. 1.      Steps involved in upload a .std file through web mail ·       Open a staad pro and locate share option on the introduction screen ·       Click share…

      calendar

      08 Nov 2023 01:37 AM IST

        Read more

        Project 2_Design & Analysis of a Hostel building at Guwahati, Assam

        Objective:

                                                                                           PROJECT – 2 AIM : …

        calendar

        04 Mar 2023 04:59 PM IST

        Read more

        Foundation Design using SAFE

        Objective:

                                                                     CHALLENGE - 12   AIM & INTRODUCTION:   To know the general design procedure of spread footing…

        calendar

        05 Feb 2023 04:11 AM IST

          Read more

          Design of Shallow Foundation (Isolated Footings)

          Objective:

          CHALLENGE - 11 ANSWERS   AIM & INTRODUCTION:   To know the general design procedure of spread footing with manual calculations. To practice how the inputs can be collaborated and arrived as data for calculations with assumptions.     Given data are:   Column size 400x400mm Compression axial…

          calendar

          22 Jan 2023 04:11 PM IST

            Read more

            Structural Modelling using Etabs 2018

            Objective:

                                                                         CHALLENGE - 10                          …

            calendar

            15 Jan 2023 10:48 AM IST

              Read more

              Analysis & Design of RCC shear walls in the model using ETABS

              Objective:

                                                                                                 CHALLENGE - 9 ANSWERS  …

              calendar

              19 Dec 2022 02:41 PM IST

              Read more

              Reinforcement detailing of Columns from ETABS output

              Objective:

                                                                                             CHALLENGE - 8 ANSWERS   AIM & INTRODUCTION:…

              calendar

              12 Dec 2022 02:19 PM IST

                Read more

                Reinforcement Detailing of Beams from ETABS output

                Objective:

                                                                                                  CHALLENGE - 7      …

                calendar

                08 Dec 2022 02:34 PM IST

                  Read more

                  Project 1_Comparative study of different storey buildings for Seismic forces

                  Objective:

                  PROJECT – 1 Comparative study of different storey buildings for Seismic forces AIM : To compare the results of various structural configuration with respect to seismic force on E-TABS. Introduction : The project consist 10 different building with various configuration having bay length of 4.00m on X & Y directions.…

                  calendar

                  24 Nov 2022 01:10 PM IST

                    Read more

                    Conceptual design of a building with columns and shear walls

                    Objective:

                    Answer 1. Criteria Observation/Conclusion For Dig. A For Diag. B For Dig. C 1.Restraint of floor shrinkage     Observation Full restraints at all corners There is no restraint at corners but on edges. Either corner or edges, non-uniform restraints.         Conclusion Drg.A will have higher…

                    calendar

                    20 Nov 2022 12:25 PM IST

                      Read more

                      Modelling of 25 storey building with the specified properties using ETABS

                      Objective:

                                                                                                     ANSWERS   AIM & INTRODUCTION: To…

                      calendar

                      13 Nov 2022 01:26 PM IST

                      Read more

                      Conceptual design of a building with columns and shear walls

                      Objective:

                      Answer (1). Criteria Observation/Conclusion For Dig. A For Diag. B For Dig. C 1.Restraint of floor shrinkage     Observation Full restraints at all corners There is no restraint at corners but on edges. Either corner or edges, non-uniform restraints.         Conclusion Drg.A will have higher…

                      calendar

                      06 Nov 2022 02:52 PM IST

                        Read more

                        Concept on positioning of Columns

                        Objective:

                        Answer – 1: Checking framing plan for Symmetry in X- direction                         We get mirror image of plan if we cut vertically half, so the given framed plan is symmetry in X-direction. Checking framing plan for Symmetry in Y- direction    …

                        calendar

                        24 Oct 2022 01:43 PM IST

                          Read more

                          Understanding the concepts on Degrees of Freedom

                          Objective:

                               1. Mass matrix (m) =                                         2. Modified mass matrix (M)  =                  For the first mode (n=1) …

                          calendar

                          17 Oct 2022 04:13 PM IST

                            Read more

                            Structural dynamics

                            Objective:

                                  1.Analysis carried on static loads are called static analysis and on dynamic loads are called as dynamic analysis.Building's dead load,live load are static loads while earthquake ,wind loads are dynamic loads. Dynamic loads will vary with time and motion shall be taken into consideration in dynamic…

                            calendar

                            23 Sep 2022 01:34 PM IST

                              Read more

                              Identification of Cracks

                              Objective:

                              (1)a. The concrete crushed and spalled out of reinforcement which might be a case of rupture failure.Beam top is safe due to flange advantage.During stress reversal, top compression is managed by slab but bottom tension could not be managed by the reinforcment.   It can not be repaired as the reinforcement got…

                              calendar

                              08 Sep 2022 02:33 PM IST

                                Read more
                                Showing 1 of 19 projects