GT Power
Now that you have a brief idea about GT Power. This challenge will help you explore the tool.
1. Explore the GUI of GT SUITE and list down modules available with brief description. (15 marks)
2. Locate following settings:
- Time control flag (5 Marks)
- Time step and solution control (5 Marks)
3. Explore intercooler tutorial and note down all settings of:
- Run setup (5 Marks)
- Advanced setup (5 Marks)
- Plot setup (5 Marks)
- Output setup (5 Marks)
4. Problem: (50 Marks)
Given
- Diameter of cooler inlet and outlet pipe= 50 mm
- Length of the CAC= 1000 mm
- Inlet mass flow rate = 1200 kg/ h at 100 degC
- Outlet pressure 2 bar at 30 deg C
- Calculate the total heat transfer at Charge air cooler (CAC)
- Calculate pressure drop across CAC
Grading Policy:
Type your report and upload supporting images and no google drive links will be accepted.
images or codes attached without a report will be graded zero marks.
GENERAL INSTRUCTIONS:
- The codes, plots, images, GIFs, and videos should be submitted only through the answer box.
- Use the Google Drive to share only the cad models or other answers which couldn't be done through the answer box.
NOTE:
- Violating the above instructions will lead to ZERO marks.
- Link sharing should be enabled while sharing the Google Drive link, else the challenge will be awarded ZERO marks.