Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

MESH CLEAN UP ON 2D SHELL ELEMENTS

PERFORMING MESH CLEAN UP ON 2D SHELL ELEMENTS Objective:                  To be able to create the 2D Mesh with target length of 5mm (Min 3.5mm to max 7.0mm) on given three components followed by Cleaning the geometry, Extract the mid surface,…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Thulasi Ram Kalichetty (17)

    Data analysis For Engine using Python

    Objective:

                                                                                        Data Analysis for Engine…

    calendar

    10 Jul 2021 03:05 PM IST

      Read more

      Curve fitting

      Objective:

                                                                                          Curve Fitting using Constant…

      calendar

      26 Mar 2021 02:36 PM IST

        Read more

        Solving second order ODEs

        Objective:

                                                                                                   …

        calendar

        05 Jan 2021 03:28 PM IST

          Read more

          Assembly of Yacht

          Objective:

                                                                                                     …

          calendar

          25 Nov 2020 03:00 AM IST

            Read more

            Air standard Cycle

            Objective:

                                                                                                       …

            calendar

            14 Nov 2020 06:47 AM IST

              Read more

              Frontal Crash of a NEON Dodge Model in FMVSS Regulation

              Objective:

                                                                                                         …

              calendar

              04 Nov 2020 12:14 AM IST

                Read more

                Side Pole Impact Analysis of NEON Doge Model in FMVSS Regulation

                Objective:

                                                                                                    Side Pole Impact Analysis…

                calendar

                04 Nov 2020 12:13 AM IST

                  Read more

                  Design, Assembling, Modelling and Photo Realistic Rendering of American Chopper

                  Objective:

                                                                                                           …

                  calendar

                  04 Nov 2020 12:11 AM IST

                  • CAE
                  • SOLIDWORKS
                  Read more

                  COMPARING THE BASE SETUP SIMULATION RESULTS AND DIFFERENT KINEMATIC CONDITION RESULTS

                  Objective:

                  Objective: To be able to the mesh for bumper assembly with mesh size 6mm. To be able to create interfaces for given model, assign the parameters for interfaces which are applicable for crash structure applications, Comparing the base setup simulation results and different kinematic condition simulation results from the…

                  calendar

                  29 Apr 2020 07:09 AM IST

                    Read more

                    COMPARING THE FAILURE ANALYSIS OF CIRCULAR PLATE WITH SEVEN DIFFERENT CASES

                    Objective:

                    Objective:                  To be able to compare given seven different cases with given shell properties by using four different material models in the tabulated format on the basis of: Total number of cycles, energy error, mass error and…

                    calendar

                    16 Apr 2020 01:30 PM IST

                      Read more

                      COMPARING THE SIMULATION RESULTS OF THE BASE SETUP AND IMPROVED SHELL ELEMENT PROPERTIES

                      Objective:

                      Comparison of results with base simulation & improved shell element properties Objective:                  To be able to compare the results with base simulation and improved shell element properties which are required for crash applications…

                      calendar

                      04 Apr 2020 09:52 AM IST

                      Read more

                      CREATING 3D MESHING AND CHANGING ENGINE FILE PROPERTIES BY EDITING STARTER FILE PROPERTIES

                      Objective:

                      Creating 3D Meshing and Changing the Properties of Engine file by  file Editing the Starter file Objective:                  To be able to create the tetra mesh and hex mesh for given solids with given specifications in Hyper Mesh. Edit…

                      calendar

                      25 Mar 2020 01:36 PM IST

                        Read more

                        MESH CLEAN UP ON 2D SHELL ELEMENTS

                        Objective:

                        PERFORMING MESH CLEAN UP ON 2D SHELL ELEMENTS Objective:                  To be able to create the 2D Mesh with target length of 5mm (Min 3.5mm to max 7.0mm) on given three components followed by Cleaning the geometry, Extract the mid surface,…

                        calendar

                        16 Mar 2020 11:48 AM IST

                          Read more

                          K Thulasi Ram Week 5 Challenges Americen Chopper

                          Objective:

                          https://drive.google.com/open?id=12-RANfd6MK-zxIUMGN7f1o2gO7CoynFX

                          calendar

                          14 Mar 2020 01:51 AM IST

                            Read more

                            K Thulasi Ram Week 4 Challenges Americen Chopper

                            Objective:

                            https://drive.google.com/open?id=1tPGNTb_ejDuLeZ2hokgFGzO0u_XMAvvK

                            calendar

                            24 Feb 2020 11:45 AM IST

                              Read more

                              K Thulasi Ram Week 2 Challenges Americen Chopper

                              Objective:

                              https://drive.google.com/open?id=1IL11tiDxB-lIryp-6ej1ia7gta7dqAFi

                              calendar

                              13 Feb 2020 03:38 AM IST

                                Read more

                                K Thulasi Ram Week 1 Challenges American Chopper

                                Objective:

                                https://drive.google.com/open?id=13poTx93wgQHKS2Tr5KqA2EmF1Bjrm-jt

                                calendar

                                07 Feb 2020 07:36 AM IST

                                  Read more
                                  Showing 1 of 17 projects