Project

MBD - Simulation on a Piston Assembly

Simulation on a Piston Assembly

Objective

To model all the parts(Piston,Wrist pin,Crank,Connecting Rod) and then assemble them in SolidWorks and to carry out motion analysis test on the motion of the setup in accordance with the various parameters given

Sl.No

Wrist Pin Offset `

Crank Speed (Rpm)

1 "0" mm 2000
2 10 mm Positive 2000
3 10 mm Negative 2000

Procedure

The various parts for the Piston assembly are modelled in solidworks according to dimensions. i.e Piston Head , Wrist Pin , Crank , Connecting Rod and End Cap and the following models are given bellow.

Piston Head

Gudegeon Pin

Connecting Rod

End Cap

Crank

Assembly:

The various components are assembled using solidworks providing various constraints so as to move the Piston Head from a uniform BDC to TDC.

Wrist Pin Offset - The position of the wrist pin is going to be varied as followed. But the center of the axis of the piston head and the crank are coincident to each other (i.e) They are on the same plane in all the three cases.

  • "0" mm Offset
  • 10 mm Positive Offset
  • 10 mm Negative Offset

Every stroke between the TDC and BDC are taken into accout for all 3 cases

Case 1: Neutral Position

Case 2: 10 mm Positive Offset

Case 3: 10 mm Negative Offset

Conclusion

From the resulting plots it seems that the neutral position the frequency is higher and therfore is prefered in an inline engine condition.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.