1st week challenge
https://drive.google.com/open?id=1xfIymsA57HCCaLMTQoDkCgrKwTToiEal
https://drive.google.com/open?id=1GAlrnZ7uy-IWlLtOZN5qSm3ssnr9diXk
https://drive.google.com/open?id=12ioNKuS9TT6BU9PEQbV-I_2jzAzymX0T
https://drive.google.com/open?id=1Zia07ku8zVeew5sFk9Qzw3RyKZ3Fsb5q
1) for the transmission belt, 2d plat was done by drawing 2 simple circles and made it is as a 2d plot and offset was made and then 2d plot was extruder.
2) for the kickstand, the elliptical 2d plot was drawn and then by using the spline was drawn and then was lofted.
3)for both rear and front fender, 2d arc was drawn and by using the revolved boss, the main part was drawn and from that by using the spit part, the fillet part was removed.