Week 7 Challenge
AIM AND INTRODUCTION : MODELLING OF THE STRUCTURE IN STAAD
PROCEDURE : First modelling one truss frame - Span of truss 30 m
creating a node at 0.0.0 - Translation repeat at x 30m
Height of column - applying Translation repeat at y 15m selecting two nodes linking steps.
ADD beams- slope of truss 20 degree 30/2=15m x tan20 = ht of truss
=5.45m add beam at mid ht of truss
truss frame by add beams
to create Floor Beams at 5 m from base - applying insert node at two olumns at 5m
add beams - beam created at 5 m from base- insert node -dividing into 5 parts=30/5=6m
copy the nodes at every 6m and paste at base -then add beams -create cols supporting floor beams
now divide all 6m span into 4 parts -to get secondary beams at every 1.5m
Length of building = 50 m bay spacing Bay spacing 5 m=50/5=10 bays
applying Translation repeat - z direction - 10 nos - link steps
Creating supports - applying support -fixed support to all main cols-pinned support to all cols supportng flr beams
RESULT- The building structure is formed
Q.2 AIM AND INTRODUCTION : APPLYING SPECIFICATION AND MEMBER PROPERTY FOR MODELLED STRUTURE.
PROCEDURE : Applying member property- SPECIFICATION-section database-member profile table -INDIAN
- selecting the sections - applying the member property
Result : all member property applied on the section.
Q.3 AIM AND INTRODUCTION : GROUPING THE MEMBERS OF THE STRUCTURE
PROCEDURE : Utilities - Groups - creating groups -select member - Associate.
RESULT - All members grouped.