Challenge

Week 12 Challenge

1.

  • Click on YES to start the Design Process.
  • Design of the Footing has been done succesfully.

Following design result has been found out:

  • Dimension of footing:3 mx 3 m
  • Over all depth of footing D = 650 m
  • Depth of footing is checked for BM, Single shear & Double shear and found safe
  • No tension steel is needed as there is no negative pressure.
  • Development length = 648 mm

Now,for validation of design of footing using hand calculation.

VALIDATION OF DESIGN THROUGH HAND CALCULATION

Footing should be symmetric with respect to column as the moment is reversible( Mx&MyMx&My are same ,that is square footing is to be designed.

Service load = 1500KN

Considering Self weight of footing & weight of backfill soil = 10% of service load

P = 1.1x 1500= 1650 KN

PuPu= 1.5x1650KN = 2475 KN

Area required = 1.1PSBCPSBC = 1.1x1500/200 = 8.25 sqm`

Acal=8.25m2Acal=8.25m2

Therefore L=B=√A=√8.25=2.87mA=8.25=2.87m

`provide square footing of size 3.0 m x 3.0 m

Aprovided=9m2Aprovided=9m2 > Area required which is 8.25 sqm (OK)

STEP-2 : NET UPWARD SOIL PRESSURE

σ(max,min)=PdAprovided+MuZσ(max,min)=PdAprovided+MuZ

= (1.5x 1.1x1500/9) ±±( 1.5x150/(B×L2/6)(B×L2/6) ( B=L=3 M)

= 275±±50

σ(max)σ(max)= 325 KN/ sqm < 370 KN/sqm ( Gross factored Bearing capacity) ( ok)

σ(min)σ(min)= 225 KN-m < 340 KN/sqm

Eccentricity e = M/P = 150/1500 = 0.1M = 100 mm

L/6= 3000/6 =500 mm

e < L/6 ,therefore no negative soil pressure will develop hence compression steel is not required.

STEP-3 DEPTH OF FOOTING ON THE BASIS OF B.M.

The maximum bending moment at the face of column (M)

= P0×(B−b)2/8P0×(B-b)2/8 = 275×3(3−0.3)2/8275×3(3-0.3)2/8= 751.78 KNm

Mu=0.138fckbd2Mu=0.138fckbd2

751.78×106×106 = 0.138x20x3000xd2d2

d = 301 mm Say d = 305 mm

Adopt d = 600 mm due to shear consideration

Add effective cover = 50 mm

D = 650 mm

Depth of footing from one way shear-

d= Pu(L−a)2(P+τc×L2)Pu(L-a)2(P+τc×L2)

= 1.5X1.1X1500( 3-0.3)/2(1.5x1.1x1500+350x9)

= 6682.5/11250 =0.594 m = 594 mm < 600 ( OK)

Depth required for two way shear ( punching shear)

PL2[L2−(a+d)2]=4(a+d)d×τpPL2[L2-(a+d)2]=4(a+d)d×τp

[1.5x1.1x15009][(9−(0.3+0.6)2]1.5x1.1x15009][(9-(0.3+0.6)2]= 4x0.9 x0.6τpτp

τpτp= 1043.98 KN/m^2 = 1.044 N/mm2mm2

Permissible τpτp= 0.25√fckfck

=0.25 √2020

= 0.25x4.472 = 1.118 N/mm2mm2 > 1.044N/mm2mm2 ( OK)

STEP-4: Reinforcement calculation

Ast=0.5fckfy[1−{1−(4.6×Mu/fckBd2)Ast=0.5fckfy[1-{1-(4.6×Mu/fckBd2)

AstAst= 5081 sqmm

p = AstB×d×100AstB×d×100

= (5081/3000x650)x100 = 0.26% > 0.12% which is min reqr , hence OK

xud=1.2−[1.44−6.6Mufck×b×d2]12xud=1.2-[1.44-6.6Mufck×b×d2]12

=1.2−[1.44−(6.6x751780x100020x3000x600x600)0.5=1.2-[1.44-(6.6x751780x100020x3000x600x600)0.5

= 0.0998

Lever Arm Z = d(1-0.416xud)xud)

= 600( 1-0.416x0.0998)

= 575.089 mm

Ast=Mu0.87×fy×ZAst=Mu0.87×fy×Z

= 751780X1000/0.87X415X575.089 = 3620.66 mm2mm2

STEP-5 : DEVELOPMENT LENGTH

As per IS 456: 2000,Cl 26.2.1.1

σs=415Nmm2σs=415Nmm2

τbdτbdfor deformed bar and M20 Grade of concrete = 1.92 N/mm2mm2

Ld=ϕ×σA4τbdLd=ϕ×σA4τbd

415ϕϕ/4x1.92 = 54ϕϕ = 54x12 = 648 mm for 12 mm dia bar.

Result: Isolated Footing for the given data has been designed succesfully using STAAD Foundation and summary of the design is as follow:

  • Dimension of footing: 3 mx 3 m
  • Over all depth of footing D = 650 mm
  • Depth of footing is checked for BM, Single shear & Double shear and found safe
  • No tension steel is needed as there is no negative pressure.
  • Development length = 648 mm.

2.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.