Challenge

Week 10 - Challenge 3 - Door Trim Lower with Engineering Features

GIVEN CLASS A SURFACE OF DOOR TRIM LOWER MODEL WAS CLOSED WITH CLASS B AND CLASS C. AND LOCATORS AND HEAT STAKES WERE SUCCESFULLY PLACED AS SHOWN IN THE REFERENCE IMAGE:

1. TOOLING AXIS CREATED FOR CORE AND CAVITY MOVEMENT FOR DEFECTLESS PART MANUFACTRUING WITH DRAFT ANGLE.

2. DRAFT ANALYSIS WERE TAKEN FOR CLASS A AND FINAL PART . SUCCESSFULLY GOT POSITIVE RESULT. BUT THE ONLY THING IS INSIDE OF THE HEAT STAKES WERE COMES IN RED. I THINK IT WOULD GET MELTED TO ASSEMBLE THE PART SO IT MIGHT BE THE ISSUE. IS MY THINKING RIGHT? KINDLY ANSWER FOR THIS.

3. LOCATORS AND HEAT STAKES WERE SUCCESSFULLY PLACES AS PER THE DESIGN STANDRARDS WHICH WAS SHOWN IN THE VIDEO. AND CLEARANCE FOR THE BOTH THE LOCATORS AND HEAT STAKES WERE GIVEN.

IMAGES FOR YOUR REFERENCE:

TOOLING AXIS:

DRAFT ANALYSIS FOR CLASS A:

CALSS B SURFACE PREPARATION:

CLASS C SURFACE PREPARATION:

SURFACE INTEGRATION CLASS A+C:

SOLID PART (BEFORE LOCATOR AND HEAT STAKES):

AFTER LOCATOR AND HEAT STAKES:

FINAL COMPONENT WITH 4 WAY LOCATOR AND HEAT STAKERS:

FINAL PERT IN DIFFERENT VIEWS:

ISO VIEW:

FRONT VIEW :

SIDE VIEW :

TOP VIEW :

DESIGN TREE:

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.