Challenge

Introduction to REVIT concepts

Ans-1)

AIM:To create the new project(structural/Architectural/Construction template) and name of the project appropriately.


INTRODUCTION OF REVIT: Revit architecture is designed to accommodate variousways to working, so that you can concentrate on your building models rather than on adapting to your methodology to software. Revit Architecture is a powerful building information modeling software for architects, engineers, designers and contractors. This fast-paced, intensive course guides students through introductory commands of Revit Architecture in order to produce working and presentation drawings.

  • open Revit Application
  • click on New project in Model

  • click on the browse

  • select the English-Imperial

  • Select the Default

  • Click the ok

  • go tho the file

  • click on the save

  • select the folder and Rename the File Name
  • click on the save

RESULT:A new file is created with Revit Challange01

Ans-2)

Aim: To Save the Project in the Revit Software and close and open using in file toolbar

Procedure:

  • open the revit again
  • click on the file
  • click on the open
  • select the project
  • choose the Revit Challange 01
  • select open

Ans-3)

AIM: to create a rectangular layout of a wallof about 40'x30'.

PROCEDURE:

  • click on the architecture tab
  • click on wall

  • click on the line

  • create a wall of 40'x35'

RESULT:

wall of 40'x35' is created using wall tools

Ans-4)

AIM: To the annotate toolbar use the alligned option to add dimension to the layout.

PROCEDURE:

  • Go to the annotate tool bar

  • select the linear

  • click the corner edge from both side one by one

RESULT: The dimension are done using annotate toolbar using allined toolbar options.

Ans-5)

AIM: To use properties browser to switch the different wall types.
PROCEDURE:

  • select the wall which you want to change the wall type
  • go the properties
  • select the Exterior-Brick on CMU
  • repeat this process 3 times

RESULT: With the use of property browser all type has been changed

Ans-6)

AIM: To create a 3D view from a view toolbar and save the view with the appropriate name

PROCEDURE:

  • select the view Tool Bar

  • click on the 3d view

RESULT: The 3D view is created by and saved it by name .

Ans-7)

AIM: To navigate through 3D model using the view cube .orbit/pan through the model layout created
PROCEDURE:

  • select the view cube
  • and select the orbit or pan view

Ans-8)

AIM: To use the visibility setting option below switch to model to shaded,relastic,hidden lines options.

PROCEDURE:

  • select the Graphic display option
  • and select the realastic

RESULT: Hidden line, shaded, realistic option are done by visibility seetting.

Ans-9)

AIM:To on and off sunpath to view the shading in layout.

PROCEDURE:

  • go to the sun setting
  • select the sun path ON

RESULT: Use of sunpath on/off is done

Ans-10)

AIM: To use manage toolbar to enter project setting name and issu date

PROCEDURE:

  • click the managetoolbar, and project information.
  • Project information dialogue box appears.
  • From the other click on project issue date and give a value.
  • Similarly select the project name, project status, client name, project address and project address and project number.

RESULT:

Ans-11)

AIM: To Analyze toolbar in Revit and its benefits.


PROCEDURE:
1. Analyze toolbar in Rivet helps in evaluating the building performance - analyzing the model by boundary conditions, loads etc., 2. It evaluates the sustainability of the model.
BENEFITS OF ANALYZE THE TOOL FOR DESIGN AND MODELLING:


• STRUCTURAL ANALYSIS it hasbeen:
Boundary condition: We can give the line and area boundary conditions to the model.
Loads: We can apply point, line and area load to the model. Load cases: We can add and edit the load cases.
Load combinations: To add load combinations.


• It also help to perform energy optimization and energy analysis.

• For energy analysis it has features.

• HEATING AND COOLING LOADS ANALYSIS:

- To create heating and cooling load analysis report, useful for mechanical enigeers for ventilations ducts or heating and cooling systems.
- Rivet allows to perform analysis in multiple disciplines, so when collabrating in every discipline they can perform their own task seperately and come together as a team to show progress.
- we can achieve the progress of project together from all discipline.

Ans-12)

AIM: TO LINKS in Revit.


PROCEDURE:

• In insert tab links are found. It is used to link different files to the file current file.
• LINK REVIT: It allows to link another rivet model to the current model.
• LINK IFC: To link ifc file to current model to reference its information for additional design works.
• LINK Cad: To link the 2d cad file to current rivet file to create 3d by rivet tools.
• LINK TOPOGRAPHY: To link to the current model.
• MANAGE LINKS: Provides features to manage the links to the building models.

Ans-13)

• It is the features which help to collabrate and help the team members to work
on the model simultaneously.

• In modelling it helps the team members of different disciplines to work on the
same file simultaneously

• The efficiency of the moddeling will be high, as the work can be finished faster.

• We do not have to wait for one model to be completed to start the model of
next discipline.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.