Aim: To prepare and analyse a transverse model of Deck slab of PSC I girder using Staad Pro

Introduction:

  1. Slab laid on top of 4 I-girders.
  2. Having supports spaced at 2.0m each.
  3. Having following geometrical properties: 

                   Thickness of slab = 0.240m

                   Width of slab = 1.0m

    4. Having material properties: Concrete, M55 grade.

Procedure : Preparation of Staad model

Create 1st node at 0,0,0 (X,Y,Z = Longitudinal, Vertical & Transverse)

Considering overhang of 1.25m on both sides from end girder for parapet

And as per given data there are 4 I girders so there will be 4 supports for deck slab spaced at 2m 

Now connecting the nodes by adding beam

Adding pinned support at the location of I grider
 
Adding property to the beam,
Thickness of slab is 240mm and this is a cross sectional model we define width as 1m so all the resuts will be for per m width of slab
Concrete grade is M55 so fcu will be 5000*(55)^0.5=37080.99 MPa
3D view of the slab
 
Loading
 
Dead Load is assigned as selfweight with factor Y as -1.
 
SIDL is divided into parapet load & plinth Load
Parapet Load assume 24kN/m, so here as it is per m model so loading will be 24kN
Assume parapet cg as 0.5m moment created will be 24*0.5=12kNm
 
Plinth Load
Assuming dispersion of rail load on 0.5m on both sides of girder
Assume value as 7kN/m
 

 Live load

 Max axle load = 16t = 160kN

Wheel load = 160/2 = 80kN

Applying this load on disperson length of 0.5m on each side of girder

Now, prepare load combinations

Assume impact factor for live load = 1.25

SLS 1 = DL+1.2SIDL

SLS 2 = DL+1.2SIDL+(1.1*1.25)LL

ULS 1 = 1.25DL+2SIDL

ULS 2 = 1.25DL+2SIDL+(1.75*1.25)LL

Cases can be created for live load to be running one time in left track and one time in right track, derailment load etc.

 

 Results

Reinforcement is designed for the maximum moment.

 5) Explain the situations where mid diaphragms are provided in a viaduct.

Ans.The application of intermediate diaphragms in concrete girders may improve impact resistance and thus survivability of bridges. The reinforced concrete intermediate diaphragms are usually provided to help minimize impact damage and improve the impact resistance of prestressed concrete bridge girders. Reinforced concrete intermediate diaphragms provide more protection for the girders than that by the structural steel ones, when the lateral impact load is applied at the location of the intermediate diaphragm; whereas there is no apparent difference in impact resistance of two types of the intermediate diaphragms if the impact load is applied away from the diaphragm location. Green, et al. (2004) studied the contribution of intermediate diaphragms in enhancing the precast bridge girder performance, and their results indicated that intermediate diaphragms have a modest positive effect of reducing the maximum deflections for the chosen girder. the diaphragm increases bridge resistance in the case of accidental lateral loading, and also stabilises the girders during construction

6) Explain the STAAD procedure for design of diaphragm how the results are extracted and explain the formula for hogging & sagging moment of the metro viaduct.

 Ans. Staad model of week 4 i.e  PSC I girder longitudinal analysis model is considered for design of diaphragm

  1. Grillage model of 4 I-girders with span length of 27.0m.
  2. Having supports at 0.700m from both ends.
  3. Having following geometrical properties: 

        End Section:  Area = 1.218m2

                             Iy = 0.32541m4

                             Iz = 0.05129m4

       Mid Section:   Area = 0.87702m2

                             Iy = 0.27835m4

                             Iz = 0.02622m4

  1. Having material properties: Concrete, M60 grade

 Others data's are assumed

Procedure: Preparation of Staad model

Open Staad pro and create 1st node at 0,0,0 (X,Y,Z = Longitudinal,Vertical,Transverse)

Since the support is at 0.7m from both ends, nodes are created as at respective nodes and last node at 27m as span length is 27m

 

Now for creating 4girders translation repeat is used in Z direction

c/c spacing of girder = 2m(assumed)

 

Now we create internal diaphragms at 2m distance in X direction

Now lets assign supports 

 

To allow longitudinal movement we release FX in next support

To allow transverse movement we release FZ in next support

Now assigning roller support for free movement in X-Z plane

 

Now creating properties of the girder and diaphragm

Concrete is of M60, therefore compressive strength = 5000(fck)^0.5 = 5000(60)^0.5= 38729.83 MPa

Creating Null property for diaphragms as these are to be modelled for as only connecting members and not of structural importance

End Girder property

Mid girder property

Tapering section property b/w end and mid girder(Average of both)

Diaphragm property

 

Now here we consider end diaphragms as 0.45m thick.

DEAD LOAD

It is assigned as self weight with factor Y -1 as we have given properties to the girder.

SIDL

Applied as 8.34kN/m - Load of plinth/deck, rails & rail pad

23.5 kN/m - Load of parapet

As parapet is in end, we take into consideration moment generated due to parapet - Cg of parapet = 0.5m Therefore moment = 23.5*0.5=11.75kNm

 

For Live Load we first define vehicle of metro, since span is 27m we define 2 bogies

Now generating moving load

No.of Load generations = (Length of vehicle + Length of span) /increment = (2.3+12.4+2.3+4.4+2.3+12.4+2.3 + 27)/0.25=261.2

Two trains are running one on left side and one on right side

Now run analysis

After analyzing lets check which beam of diaphragm has maximum moment

For DL beam 20&6

For SIDL Beam 6

For Live Load beam 19

Since maximum Fz is for SIDL & DL at beam 6 so we extract section forces for beam 6

SLS Load combination

DL+1.2SIDL+1.1LL*Impact

Impact factor = 1+0.15(8/(6+L)*0.72=1+0.15(8/(6+25)*0.72=1.29

As we have 2 tracks impact factor shall be reduced by 0.72 as per IRS bridge rules clause.2.4.1.1

SLS Moment Hogging(+ve) = 1.4+1.2*14.8+1.1*(-5.057)*1.29=11.98kNm

SLS Moment Sagging (-ve)=3.892+1.2*(-3.315)+1.1*2.804*1.29=3.89kNm

Reinforcement is checked for these moment using software

 7)Where jacks can be placed for lifting the sections under the diaphragm. Also, what is the distance between the center of the girder to center of the jacks.

Ans.  Jacking is done when we replace bearing after its lifetime. So we support the structure from end diaphragms at both ends between the girders. Generally the distance of jacks from the girder is 0.65m.

8)Prepare a line model for jacking case, considering the distance between the center of the girder to center of the jacks as 650mm & other inputs mentioned in the video session.

Ans. 

 

9)As a result of moment extraction & sectional check, what are the values we attain to check that our design is safe.

Ans. Hogging moment, Sagging moment, Allowable Fc, Allowable Fs and Allowable crack width are the values we get to check our design.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.