Bhuvana Chandrika Natharga
EMPLOYEE@CYIENT
Introduction
6 Projects
Project 1 - Creation of user defined data type to implement the user interfaces for working with ‘Set’ (Mathematical Set theory)
PROJECT 1 - //C program to find union and intersection of two unsorted linked lists//#include #include #include /* Linked list node */struct Node{int data;struct Node* next; };/* A utility function to insert a node at the beginning of a linked list*/void push(struct Node** head_ref, int new_data);/* A utility function…
04 Mar 2022 12:08 PM IST
Project 1 - Interfacing a 16*2 LCD with Arduino using I2C protocol
//I2C MASTERCODE//I2C communication between two arduino#include<Wire.h> //Library for I2C Communication functions#include<LiquidCrystal.h> //Library for LCD display functionLiquidCrystal lcd(2, 7, 8, 9, 10, 11); //Define LCD Module Pins (RS,EN,D4,D5,D6,D7) void setup() {lcd.begin(16,2); //Initilize LCD displaylcd.setCursor(0,0);…
13 Mar 2022 07:33 AM IST
Project 2 - Measuring the distance of an object using ultrasonic sensor and also smoothen the sensor data using moving average filter
const int pingPin = 7;int red = 11;int blue = 10;int green = 9;void setup() { // initialize serial communication: Serial.begin(9600); pinMode(red, OUTPUT); pinMode(blue, OUTPUT); pinMode(green, OUTPUT); } void loop() { // establish variables for duration of the ping, and the distance result // in inches and centimeters:…
13 Mar 2022 09:46 AM IST
Project 2 - Implement the Code for controlling the retraction and extension of Airplane’s landing gear
CODE : #include<stdio.h>#include<conio.h>typedef enum{Gear_Down_State,Checking_before_Take_off_Delay_3s_State,Raising_Gear_State,Gear_Up_State,Checking_before_landing_State,Lowering_Gear_State,} eSystemState;//Different type eventstypedef enum{Checking_before_takeoff_delay_3s_Event,Raising_gear_Event,Gear_up_Event,checking_before_landing_Event,Lowering_gear_Event}…
14 Mar 2022 03:56 PM IST
Project 1 - V&V SW Analysis - I
PROJECT 1 V&V SW ANALYSIS -1 :- A TEST PLAN to test features of new mobile phone using BLACKBOX TESTING is enclosed in the below attachment.
25 Mar 2022 11:25 AM IST
Project 2 - V&V SW Analysis II
As per the Given questions I have created test cases. And attached the regression, dynamic coverage analysis, test manager reports as enclosed below.
28 Mar 2022 05:40 PM IST
4 Course Certificates
Software Verification and Validation and System Testing for Hand Code
Academic Qualification
B.Tech
CVR College Of Engineering
07 Aug 2017 - 13 Jun 2021
12th
Sri Nalanda junior College
12 Jun 2015 - 07 Apr 2017
10th
DAV Model School
16 Jun 2014 - 11 Apr 2015
Here are the courses that I have enrolled
13 Hours of Content
Similar Profiles
Ladder of success cannot be climbed with hands in pocket.
The Future in Motion
Give more than what you get you will get more than what you gave
Avid learner